浏览全部资源
扫码关注微信
1.西安交通大学电气工程学院,陕西省西安市 710049
2.国家电网有限公司西北分部,陕西省西安市 710048
张洪基(2000—),男,博士研究生,主要研究方向:能源经济。E-mail:eddie200218@stu.xjtu.edu.cn
丁涛(1986—),男,通信作者,博士,教授,博士生导师,主要研究方向:电力系统经济运行、电力市场、能源经济。E-mail:tding15@xjtu.edu.cn
黄雨涵(2000—),女,博士研究生,主要研究方向:电力市场。E-mail:hyh2018@stu.xjtu.edu.cn
收稿:2023-10-22,
修回:2024-01-26,
网络出版:2024-04-09,
纸质出版:2024-06-10
移动端阅览
张洪基,丁涛,黄雨涵等.电力市场环境下抽水蓄能电站容量电费定价与成本分摊方法[J].电力系统自动化,2024,48(11):88-99.
ZHANG Hongji,DING Tao,HUANG Yuhan,et al.Pricing and Cost Allocation Methods for Capacity Charges of Pumped Storage Power Stations in Electricity Market Environment[J].Automation of Electric Power Systems,2024,48(11):88-99.
张洪基,丁涛,黄雨涵等.电力市场环境下抽水蓄能电站容量电费定价与成本分摊方法[J].电力系统自动化,2024,48(11):88-99. DOI: 10.7500/AEPS20231022001.
ZHANG Hongji,DING Tao,HUANG Yuhan,et al.Pricing and Cost Allocation Methods for Capacity Charges of Pumped Storage Power Stations in Electricity Market Environment[J].Automation of Electric Power Systems,2024,48(11):88-99. DOI: 10.7500/AEPS20231022001.
抽水蓄能电站作为一种有效的电力系统灵活性资源,将成为保障新型电力系统安全稳定运行的重要手段。制定合理的回收抽水蓄能电站建设固定成本方案是支撑系统运行、激励投资的关键问题。在抽水蓄能电站的市场化运行背景下,构建了抽水蓄能电站顺次参与现货-辅助服务市场的容量电费定价模型,实现以经营期内收支平衡为目标定期滚动核定抽水蓄能电站的待分摊成本。同时,考虑抽水蓄能电站容量电费的潜在分摊对象,提出采用效用比例VCG(Vickrey-Clarke-Groves)机制对抽水蓄能电站容量电费进行成本分摊,量化源荷侧分摊主体的替代效益,并将容量电费按比例分摊。实际系统算例的仿真分析验证了所提方法的有效性。
Pumped storage power stations
as effective flexibility resources for power systems
will become crucial in ensuring the safe and stable operation of new power systems. The formulation of reasonable schemes for recovering the fixed costs of construction of pumped storage power stations is a key issue in supporting system operation and stimulating investment. In the context of marketization operations for pumped storage power stations
this paper constructs a capacity charge pricing model that sequentially integrates the pumped storage power stations into the spot and ancillary service markets
achieving regular recalibration of the unallocated costs of pumped storage power stations with the objective of revenue and expenditure balance during the operation period. Meanwhile
considering the potential entities for allocating the capacity charges of pumped storage power stations
a utility-proportional Vickrey-Clarke-Groves (VCG) mechanism is proposed to allocate costs of the capacity charges of pumped storage power stations
quantify the substitutive benefits of allocation entities on both the source and load sides
and proportionally allocate the capacity charges. Effectiveness of the proposed method is validated through simulation analysis of actual system cases.
鲁宗相 , 林弋莎 , 乔颖 , 等 . 极高比例可再生能源电力系统的灵活性供需平衡 [J]. 电力系统自动化 , 2022 , 46 ( 16 ): 3 - 16 .
LU Zongxiang , LIN Yisha , QIAO Ying , et al . Flexibility supply-demand balance in power system with ultra-high proportion of renewable energy [J]. Automation of Electric Power Systems , 2022 , 46 ( 16 ): 3 - 16 .
QU M , DING T , SUN Y G , et al . Convex hull model for a single-unit commitment problem with pumped hydro storage unit [J]. IEEE Transactions on Power Systems , 2023 , 38 ( 5 ): 4867 - 4880 .
TAN X Q , LI C S , LIU D , et al . Multi-time scale model reduction strategy of variable-speed pumped storage unit grid-connected system for small-signal oscillation stability analysis [J]. Renewable Energy , 2023 , 211 : 985 - 1009 .
丁怡婷 . 抽水蓄能已建在建装机规模 1 . 6 亿千瓦[N]. 人民日报 , 2023-06-29 (8).
DING Yiting . Pumped storage capacity under construction and operational reaches 160 million kilowatts [N]. People’s Daily , 2023-06-29 (8).
张钰 . “双碳”目标下抽水蓄能电价政策研究——以沂蒙抽水蓄能电站项目为例 [J]. 价格理论与实践 , 2021 ( 12 ): 35 - 37 .
ZHANG Yu . Research on the price policy of pumping storage power under the target of “double carbon” —take Yimeng pumping water storage power station project as an example [J]. Price: Theory & Practice , 2021 ( 12 ): 35 - 37 .
国家能源局 . 《抽水蓄能中长期发展规划(2021—2035年)》印发实施 [EB/OL].( 2021-09-09 )[ 2023-09-28 ]. http://www.nea.gov.cn/2021-09/09/c_1310177087.htm http://www.nea.gov.cn/2021-09/09/c_1310177087.htm .
National Energy Administration . Issuance and implementation of “Medium-to-long Term Development Plan for Pumped Storage ( 2021 — 2035 )”[EB/OL]. ( 2021-09-09 )[ 2023-09-28 ]. http://www.nea.gov.cn/2021-09/09/c_1310177087.htm http://www.nea.gov.cn/2021-09/09/c_1310177087.htm .
国家发展和改革委员会 . 关于抽水蓄能电站建设管理有关问题的通知 [EB/OL].( 2004-01-12 )[ 2023-09-28 ]. http://www.nea.gov.cn/2008-08/01/c_131053913.htm http://www.nea.gov.cn/2008-08/01/c_131053913.htm .
National Development and Reform Commission . Notice on issues concerning the construction and management of pumped storage power stations [EB/OL]. ( 2004-01-12 )[ 2023-09-28 ]. http://www.nea.gov.cn/2008-08/01/c_131053913.htm http://www.nea.gov.cn/2008-08/01/c_131053913.htm .
国家发展和改革委员会 . 关于完善抽水蓄能电站价格形成机制有关问题的通知 [EB/OL]. ( 2014-07-31 )[ 2023-09-28 ]. http://www.hydropower.org.cn/showNewsDetail.asp?nsId=14038 http://www.hydropower.org.cn/showNewsDetail.asp?nsId=14038 .
National Development and Reform Commission . Notice on issues related to the refinement of the pricing mechanism for pumped storage power stations [EB/OL]. ( 2014-07-31 )[ 2023-09-28 ]. http://www.hydropower.org.cn/showNewsDetail.asp?nsId=14038 http://www.hydropower.org.cn/showNewsDetail.asp?nsId=14038 .
国家发展和改革委员会 . 关于进一步完善抽水蓄能价格形成机制的意见 [EB/OL].( 2021-04-30 )[ 2023-09-28 ]. https://www.ndrc.gov.cn/xxgk/zcfb/tz/202105/t20210507_1279341.html https://www.ndrc.gov.cn/xxgk/zcfb/tz/202105/t20210507_1279341.html .
National Development and Reform Commission . Opinions on further improving the pricing mechanism for pumped storage energy [EB/OL]. ( 2021-04-30 )[ 2023-09-28 ]. https://www.ndrc.gov.cn/xxgk/zcfb/tz/202105/t20210507_1279341.html https://www.ndrc.gov.cn/xxgk/zcfb/tz/202105/t20210507_1279341.html .
赵晨晨 , 马良 , 翟海燕 . 基于峰谷电价的抽水蓄能电站效益分析研究 [J]. 建筑经济 , 2022 , 43 ( 增刊2 ): 467 - 470 .
ZHAO Chenchen , MA Liang , ZHAI Haiyan . Benefit analysis of pumped storage power station based on peak-valley electricity price [J]. Construction Economy , 2022 , 43 ( Supplement 2 ): 467 - 470 .
柳洋 , 何永秀 , 李谟兴 , 等 . 市场环境下抽水蓄能电站的价格市场衔接机制设计与效益评估 [J]. 现代电力 , 2023 , 40 ( 1 ): 42 - 49 .
LIU Yang , HE Yongxiu , LI Moxing , et al . Design of price market linkage mechanism and economic benefit evaluation of pumped storage power station under the power market environment [J]. Modern Electric Power , 2023 , 40 ( 1 ): 42 - 49 .
翟海燕 , 樊伟 , 张予燮 , 等 . 抽水蓄能电站两部制电价机制研究——基于电量电价盈利与容量电价定价测算模型构建的分析 [J]. 价格理论与实践 , 2022 ( 9 ): 178 - 182 .
ZHAI Haiyan , FAN Wei , ZHANG Yuxie , et al . Study on two-part electricity price mechanism of pumped storage power station—analysis of calculation model construction based on electricity price profitability and capacity price pricing [J]. Price: Theory & Practice , 2022 ( 9 ): 178 - 182 .
YANG Z F , LEI X Y , YU J , et al . Objective transmission cost allocation based on marginal usage of power network in spot market [J]. International Journal of Electrical Power & Energy Systems , 2020 , 118 : 105799 .
王永利 , 王硕 , 郑燕 , 等 . 基于弹性网络的电网工程运行维护成本分摊计算 [J]. 电力系统自动化 , 2020 , 44 ( 20 ): 165 - 172 .
WANG Yongli , WANG Shuo , ZHENG Yan , et al . Calculation and allocation of operation and maintenance cost of power grid project based on elastic net [J]. Automation of Electric Power Systems , 2020 , 44 ( 20 ): 165 - 172 .
李咸善 , 解仕杰 , 方子健 , 等 . 多微电网共享储能的优化配置及其成本分摊 [J]. 电力自动化设备 , 2021 , 41 ( 10 ): 44 - 51 .
LI Xianshan , XIE Shijie , FANG Zijian , et al . Optimal configuration of shared energy storage for multi-microgrid and its cost allocation [J]. Electric Power Automation Equipment , 2021 , 41 ( 10 ): 44 - 51 .
陈岑 , 武传涛 , 康慨 , 等 . 基于改进Owen值法的分布式储能双层合作博弈优化策略 [J]. 中国电机工程学报 , 2022 , 42 ( 11 ): 3924 - 3935 .
CHEN Cen , WU Chuantao , KANG Kai , et al . Optimal strategy of distributed energy storage two-layer cooperative game based on improved Owen-value method [J]. Proceedings of the CSEE , 2022 , 42 ( 11 ): 3924 - 3935 .
BARBOUR E , GRANT WILSON I A , RADCLIFFE J , et al . A review of pumped hydro energy storage development in significant international electricity markets [J]. Renewable and Sustainable Energy Reviews , 2016 , 61 : 421 - 432 .
叶泽 , 黄姗姗 , 王亚莉 . 电力市场改革背景下抽水蓄能电站电价机制研究 [J]. 价格理论与实践 , 2020 ( 11 ): 26 - 29 .
YE Ze , HUANG Shanshan , WANG Yali . Research on electricity price mechanism of pumped storage power station under the background of electricity market reform [J]. Price: Theory & Practice , 2020 ( 11 ): 26 - 29 .
国家发展和改革委员会 , 国家能源局 . 关于印发《电力现货市场基本规则(试行)》的通知 [EB/OL].( 2023-09-07 )[ 2023-09-28 ]. http://zfxxgk.nea.gov.cn/2023-09/07/c_1310741791.htm http://zfxxgk.nea.gov.cn/2023-09/07/c_1310741791.htm .
National Development and Reform Commission, National Energy Administration . Notice on issuing “Basic Rules for the Electricity Spot Market (Trial) ”[EB/OL]. ( 2023-09-07 )[ 2023-09-28 ]. http://zfxxgk.nea.gov.cn/2023-09/07/c_13107 41791.htm http://zfxxgk.nea.gov.cn/2023-09/07/c_1310741791.htm .
肖云鹏 , 张兰 , 张轩 . 包含独立储能的现货电能量与调频辅助服务市场出清协调机制 [J]. 中国电机工程学报 , 2020 , 40 ( 增刊1 ): 167 - 180 .
XIAO Yunpeng , ZHANG Lan , ZHANG Xuan . The coordinated market clearing mechanism for spot electric energy and regulating ancillary incorporating independent energy storage resources [J]. Proceedings of the CSEE , 2020 , 40 ( Supplement 1 ): 167 - 180 .
关玉衡 , 张经纬 , 张轩 , 等 . 美国电力市场环境下抽水蓄能调度模式分析及启示 [J]. 电力系统自动化 , 2021 , 45 ( 13 ): 1 - 11 .
GUAN Yuheng , ZHANG Jingwei , ZHANG Xuan , et al . Analysis and enlightenment of pumped storage dispatch modes under American electricity market [J]. Automation of Electric Power Systems , 2021 , 45 ( 13 ): 1 - 11 .
王进 , 张粒子 , 赵志芳 , 等 . 抽水蓄能电站市场化运行机制和日前市场出清模型 [J]. 电力系统自动化 , 2023 , 47 ( 12 ): 145 - 153 .
WANG Jin , ZHANG Lizi , ZHAO Zhifang , et al . Marketization operation mechanism and clearing model of day-ahead market for pumped storage stations [J]. Automation of Electric Power Systems , 2023 , 47 ( 12 ): 145 - 153 .
国家能源局华中监管局 . 华中能源监管局关于印发《江西电力调频辅助服务市场运营规则》的通知 [EB/OL].( 2022-12-27 )[ 2023-06-21 ]. http://hzj.nea.gov.cn/adminContent/initViewContent.do?pk=F0E33C659A77CD5CE050A8C0C1C82281 http://hzj.nea.gov.cn/adminContent/initViewContent.do?pk=F0E33C659A77CD5CE050A8C0C1C82281 .
Central China Energy Regulatory Bureau of National Energy Administration . Notice of Central China Energy Regulatory Bureau on printing and distributing “Jiangxi Power Frequency Regulation Auxiliary Service Market Operation Rules” [EB/OL]. ( 2022-12-27 )[ 2023-06-21 ]. http://hzj.nea.gov.cn/adminContent/initViewContent.do?pk=F0E33C659A77CD5CE050A8C0C1C82281 http://hzj.nea.gov.cn/adminContent/initViewContent.do?pk=F0E33C659A77CD5CE050A8C0C1C82281 .
刘硕 , 杨燕 , 杨知方 , 等 . 计及新能源随机特性的备用容量确定及其成本分摊 [J]. 电力系统自动化 , 2023 , 47 ( 4 ): 10 - 18 .
LIU Shuo , YANG Yan , YANG Zhifang , et al . Reserve capacity determination and its cost allocation considering stochastic characteristics of renewable energy [J]. Automation of Electric Power Systems , 2023 , 47 ( 4 ): 10 - 18 .
CHAKRABORTY P , BAEYENS E , KHARGONEKAR P P . Cost causation based allocations of costs for market integration of renewable energy [J]. IEEE Transactions on Power Systems , 2018 , 33 ( 1 ): 70 - 83 .
MILLIGAN M , ELA E , HODGE B M , et al . Integration of variable generation, cost-causation, and integration costs [J]. The Electricity Journal , 2011 , 24 ( 9 ): 51 - 63 .
安麒 , 王剑晓 , 武昭原 , 等 . 高比例可再生能源渗透下的电力市场价值分配机制设计 [J]. 电力系统自动化 , 2022 , 46 ( 7 ): 13 - 22 .
AN Qi , WANG Jianxiao , WU Zhaoyuan , et al . Benefit allocation mechanism design of electricity markets with penetration of high proportion of renewable energy [J]. Automation of Electric Power Systems , 2022 , 46 ( 7 ): 13 - 22 .
NISAN N , ROUGHGARDEN T , TARDOS É , et al . Algorithmic game theory [M]. New York, USA : Cambridge University Press , 2007 .
0
浏览量
0
下载量
4
CSCD
关联资源
相关文章
相关作者
相关机构
京公网安备11010802024621