Aimed at spatio-temporal correlation of natural gas line-pack
it is significant to use multiple time scale and model predictive control. Considering the slow dynamic characteristics of natural gas pipeline network and the time interval coupling effect of transient variables of natural gas system
a multiple time scale optimal scheduling strategy based on model predictive control is proposed
which makes the control process of computing the active power outputs and gas production by gas resource more smoothly. And then
taking the active power output and gas production obtained by day-ahead scheduling as reference values
the multi-step rolling optimization based on model predictive control is carried out in intra-day scheduling. Finally
the modified IEEE 24-node power system and the Belgian 20-node natural gas system are used to verify the feasibility and effectiveness of optimization scheduling strategy
and the influences on the operation of the integrated power and gas energy systems of natural gas line-pack are analyzed.