The 20 kV petalshape distribution network in SinoSingapore Guangzhou Knowledge City is introduced
and its characteristics that has several resources in the internal network but only one external resource in the power supply substation is analyzed. According to the requirement
a recovery control scheme for the petalshape distribution network based on the distribution management system’ graphical modeling tools
operating information and state estimate algorithm is proposed. The recovery scheme includes information validity checking
fault identification
recovery strategy calculation and execution
which can eliminate the influence of bad information
identify the fault type
choose the standby resource
cut off the over load and recovery the power supply automatically. Some necessary errorprevent measures are also proposed to improve the reliability. The recovery control functions are proved by the laboratory simulation test
and its reliability is analyzed with the typical telecontrol information.