In light of the future situation of large-scale access to distributed generators
a substation optimization method for siting and sizing based on the capacity credit evaluation of the distributed generator (DG) is proposed. First
based on the principle that the reliability of the system remains unchanged before and after DG’s access
a capacity credit evaluation method for DG is proposed from the reliability perspective
which takes the transformer fault and the temporal property of DG’s power supply into consideration. Furthermore
with reference to the weighted Voronoi diagram method
a substation siting and sizing method with DG taken into account is proposed. In the end
both the effectiveness and practicability of the proposed method are verified through comparison and analysis of calculation examples. This work is supported by National Natural Science Foundation of China (No. 51477116).