Based on time domain simulation and grid physical qualitative analysis
a large amount of simulation calculation in multiple operation modes of different years is performed on China’s northwest power grid
which is a typical long distance transmission system. The out-of-step oscillation centers distribution
influencing factors and characteristics are summarized. For generators suffering oscillation energy impact from the islanding near the oscillation center and failure to keep synchronization with either oscillated generator group
measures to improve islanding operation are taken to ensure rational islanding of the major out-of-step units prior to choosing the islanding cross section on the principle of the recovery effect of the islanded sub-grid groups. This work is supported by State Grid Corporation of China
Major Projects on Planning and Operation Control of Large Scale Grid (No. SGCC-MPLG001-2012).