The practice of manual generation of primary equipment wiring diagram
equipment attributes
misoperation prevention rules and manual writing of operation order
in the current substation misoperation prevention system and dispatch misoperation prevention system
is time-consuming and labor-intensive
which is inconsistent with the requirement of the automatic system. A method of automatic generation of diagram-database-rules-order based on the bay model is proposed. A typical bay model including primary typical bay and secondary typical bay is developed
based on which
a method of automatic generation of primary equipment wiring diagram
database
misoperation prevention rules
operation order is described. Also developed is the software of automatic generation of diagram-database-rules and operation order. The research results are in application.