An agile and coordinated voltage control method is proposed to deal with the power system reactive power and voltage operation with large scale wind power integration. In the provincial control center
the agile voltage control method with the wind power volatility and the power system N-1 security constraints taken into account is proposed. With this method
by means of the adaptive adjustment of the control period and control model
the wind farm reactive ability will be fully tapped to suppress the influence of wind fluctuations on the bus voltage while sufficient dynamic reactive power regulation margin of traditional generators will be retained. Between provincial and prefectural control centers
the bidirectional interaction based voltage control method is presented to support the voltage at the terminal power network while bypassing the unnecessary discrete device action on the prefectural grid. By coordinated voltage control among the wind farms and substations in the provincial power system
the control abilities of its own wind farms will be made full use of
there will be less capacitor and reactor action times in its own substations and unnecessary reactive power flow. By the bidirectional interaction between provincial and prefectural control centers
the distributed adjustment resources can well be used to support the voltage at the terminal power network and increase the safety and economy of overall operation of the power system. The wind automatic voltage control system is currently in real-time operation in Jiangsu power system.