Xiluodu Right Bank Power Station-Guangdong ±500 kV double-circuit high-voltage direct current(HVDC)transmission project sharing the same tower is the worlds first ever with the same converter station,which works both ways to adapt to operating independently,but also to adapt to the coordinated operation mode.Firstly,a hierarchical structure of the double-circuit HVDC control system is presented.Then according to the characteristics of the double-circuit control layer,a detailed research on the double-circuit HVDC power control function is put forward.A simulation model in PSCAD/EMTDC is built for this system for analysis of three typical operation modes.The feasibility and effectiveness of the coordinated control strategy is verified by the simulation results.