
浏览全部资源
扫码关注微信
由于机组的初加速度与其到故障点的电气距离成反比,故失稳机群一般都在故障点附近。但在对互联大电网的仿真中却发现了远离故障点的机群失稳的实例,并进一步发现故障点附近的负荷变化不但可能改变临界群或失稳摆次,并且可能同时改变两者。用扩展等面积准则(EEAC)揭示其机理。仿真验证了切机等紧急控制措施对相邻摆次的影响相反,在临界群与在余下群中实施的效果相反。进一步证实,当主导映像上的等值机械功率接近于故障后电功率的非周期分量时,失稳模式很可能发生分岔。
The critical cluster is normally made up of the generators near the fault location because their initial accelerations are in inverse proportion to the electrical distance between the units and the fault location. However, simulations on the national interconnected power grid show that remote units can also become the critical ones in some cases. Furthermore, it is also found that variation of the loads near the disturbance can not only change the critical cluster or the instability swing, but also can change both aspects simultaneously. Mechanisms are unfolded using EEAC stability theory. Based on theoretical analysis and simulation results, it has been verified that control effects are opposite not only between the critical cluster and the remaining cluster, but also between two neighboring swings if the same kind of control actions, such as generator tripping, are adopted. Further studies prove that the bifurcation on unstable modes may take place when the value of equivalent mechanical power is close to that of the aperiodic component of the post-fault electrical power.
0
浏览量
2035
下载量
10
CSCD
关联资源
相关文章
相关作者
相关机构
京公网安备11010802024621