Close is the correlation between frequency regulation
peak load and tieline regulation in the interconnected power system. In the process of peak climbing
how to prevent the impact of the interconnected power system support on the tieline and solve the problem of AGC units lacking capacity is the key problem in the peak active dispatch. This paper builds a model for coordinating optimal dispatching of peak climbing for the interconnected power system. The units relating to tieline can be procured by an electrical dissection algorithm in the sending and receiving network at the first peak climbing stage. Then the regulating capacities of NONAGC units in the sending and receiving network are checked and NONAGC units are divided into two unit groups
the regulating capacity short and regulating capacity abundant group. In the process of peak climbing
firstly
the units relating to tieline is dispatched so as to maintain the scheduled power of tieline. Then various units in the sending and receiving network are coordinated at the same time
including the NONAGC units and AGC units
as well as the regulating capacity short and regulating capacity abundant unit groups. The case analysis demonstrates the feasibility of the model proposed.