In power market, such uncertain factors have been introduced for generation investment decision-making as the competition from other generating companies(Gencos) and the variation of investment value, whose influences are usually neglected in traditional methods of generation expansion planning. Based on the Black-Scholes option pricing theory and non-cooperative game theory, a deferment option game model of generation investment is developed, which makes the strategies of Gencos’ generation investment more rational. The rationality and validity of the method proposed is illuminated by a practical test example.