The 750 kV transmission pilot project in Northwest China is the highest voltage level transmission project in China, which makes even higher reliability and speed requirements on relay protection. The configuration, operating mode and issues for attention concerning the relay protection in the artificial short-circuit test are briefly described. The operating mode and emphasis during system commissioning measurement are also analyzed and researched. Finally, the existing major problem in the application of relay protection is discussed and a solution is put forward.