您当前的位置:
首页 >
文章列表页 >
Technical System Construction for Virtual Power Plants from First Principles Perspective
Special Session on Virtual Power Plant with Enormous Flexible Resources | 更新时间:2026-02-28
    • Technical System Construction for Virtual Power Plants from First Principles Perspective

    • Automation of Electric Power Systems   Vol. 49, Issue 20, Pages: 3-15(2025)
    • DOI:10.7500/AEPS20250610009    

      CLC:
    • Received:10 June 2025,

      Revised:2025-07-13,

      Online First:02 September 2025,

      Published:25 October 2025

    移动端阅览

  • ZHOU Baorong,GAO Hongchao,CHENG Renli,et al.Technical System Construction for Virtual Power Plants from First Principles Perspective[J].Automation of Electric Power Systems,2025,49(20):3-15. DOI: 10.7500/AEPS20250610009.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Business Model and Key Technologies of Virtual Power Plant for New Power System
Reinforcement Learning Based Dynamic Aggregation and Multi-timescale Bidding Strategy for Virtual Power Plants
Development Status and Engineering Application of Grid-forming Converter Technology

Related Author

Xinxin GE
Zhiyang FU
Fei XU
Fei WANG
Junlong WANG
Tao WANG
GAO Yuanhao
ZHANG Jihang

Related Institution

Department of Electrical Engineering, North China Electric Power University
Department of Mathematics and Physics, North China Electric Power University
State Key Laboratory of Power System and Generation Equipment (Tsinghua University)
State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources (North China Electric Power University)
Hebei Key Laboratory of Distributed Energy Storage and Microgrid (North China Electric Power University)
0