您当前的位置:
首页 >
文章列表页 >
Risk Assessment of Cascading Failures in Electricity-Gas Interconnection System Considering Multi-states of Components
Basic Research | 更新时间:2026-02-28
    • Risk Assessment of Cascading Failures in Electricity-Gas Interconnection System Considering Multi-states of Components

    • Automation of Electric Power Systems   Vol. 50, Issue 1, Pages: 130-142(2026)
    • DOI:10.7500/AEPS20250407002    

      CLC:
    • Received:07 April 2025,

      Revised:2025-08-10,

      Online First:03 December 2025,

      Published:10 January 2026

    移动端阅览

  • NAN Lu,MA Yiyang,HE Chuan.Risk Assessment of Cascading Failures in Electricity-Gas Interconnection System Considering Multi-states of Components[J].Automation of Electric Power Systems,2026,50(1):130-142. DOI: 10.7500/AEPS20250407002.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Risk Assessment of Cascading Failures in Flexible Interconnected Power Distribution System
基于渗流和风险理论的电力系统连锁故障分析
基于风险评估的电力系统连锁故障协调控制模型
基于最优风险指标的连锁故障模型和薄弱线路辨识

Related Author

Yu XUE
Yueqiao LI
Wenxia LIU
Zeyuan SHEN
Qi LI
Shuai ZHAI
ZHANG Juan
DING Ming

Related Institution

State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources (North China Electric Power University)
Economic and Technological Research Institute of State Grid Shanxi Electric Power Co., Ltd.
Linfen Power Supply Company of State Grid Shanxi Electric Power Co., Ltd.
School of Electrical Engineering, Southwest Jiaotong University
School of Electrical Engineering and Automation, Hefei University of Technology
0