您当前的位置:
首页 >
文章列表页 >
Fault Repair Strategy of Regional Integrated Energy System Based on Load Recovery Efficiency
Basic Research | 更新时间:2026-02-28
    • Fault Repair Strategy of Regional Integrated Energy System Based on Load Recovery Efficiency

    • Automation of Electric Power Systems   Vol. 49, Issue 23, Pages: 27-37(2025)
    • DOI:10.7500/AEPS20250122001    

      CLC:
    • Received:22 January 2025,

      Revised:2025-06-26,

      Online First:25 August 2025,

      Published:10 December 2025

    移动端阅览

  • YU Xiaodan,DU Jie,XU Kaiwen,et al.Fault Repair Strategy of Regional Integrated Energy System Based on Load Recovery Efficiency[J].Automation of Electric Power Systems,2025,49(23):27-37. DOI: 10.7500/AEPS20250122001.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

In- and Post-disaster Two-stage Coordinated Resilience Recovery Decision of Distribution Network Considering Distributed Generators
多能互补、集成优化能源系统关键技术及挑战
Integrated Satellite-Terrestrial Cyber-Physical Collaborative Restoration Strategy for Distribution Systems Under Wildfire Disasters
Coordinated Emergency Dispatch of Multiple Resources Considering Regulation Characteristics Under Typhoon Disaster

Related Author

YU Xiaodan
DU jie
XU Kaiwen
HOU Kai
JIA Hongjie
LIU Yuling
ZHANG Feng
ZHANG Gang

Related Institution

Key Laboratory of the Ministry of Education on Smart Power Grids, Tianjin University
Rizhao Power Supply Company, State Grid Shandong Electric Power Company
Key Laboratory of Power System Intelligent Dispatch and Control of Ministry of Education(Shandong University)
Yantai Research Institute of Harbin Engineering University
School of Electronic Information and Electrical Engineering, Shanghai Jiao Tong University
0