

浏览全部资源
扫码关注微信
1.国网电力科学研究院有限公司(南瑞集团有限公司),江苏省南京市211106
2.国电南瑞南京控制系统有限公司,江苏省南京市 211106
3.国家电网有限公司国家电力调度控制中心,北京市100031
Received:25 October 2024,
Revised:2025-03-03,
Online First:06 May 2025,
Published:10 December 2025
移动端阅览
管金昱,王德林,昌力等.考虑多随机交付场景的爬坡辅助服务市场出清模型[J].电力系统自动化,2025,49(23):186-197.
GUAN Jinyu,WANG Delin,CHANG Li,et al.Clearing Model for Ramping Ancillary Service Market Considering Multiple Stochastic Delivering Scenarios[J].Automation of Electric Power Systems,2025,49(23):186-197.
管金昱,王德林,昌力等.考虑多随机交付场景的爬坡辅助服务市场出清模型[J].电力系统自动化,2025,49(23):186-197. DOI: 10.7500/AEPS20241025004.
GUAN Jinyu,WANG Delin,CHANG Li,et al.Clearing Model for Ramping Ancillary Service Market Considering Multiple Stochastic Delivering Scenarios[J].Automation of Electric Power Systems,2025,49(23):186-197. DOI: 10.7500/AEPS20241025004.
提升系统爬坡能力是应对新能源高比例接入下超短期供需平衡问题的重要手段,爬坡辅助服务市场已成为爬坡资源优化配置的重要途径。保障预留爬坡容量的可交付性,降低爬坡采购成本,提升市场整体运营效率,是未来爬坡辅助服务市场精细化运营所面临的关键问题。美国中部独立系统运营商(MISO)与美国加州独立系统运营商(CAISO)先后针对爬坡可交付性问题开展了探索性的研究与实践,但依然存在交付场景设置单一、交付率提升有限、多目标优化冲突等问题。为此,文中提出了考虑多随机交付场景的爬坡辅助服务市场出清模型。通过设置多随机交付场景,构建柔性可交付性约束,解决爬坡采购充裕性与可交付性冲突的问题,实现了爬坡辅助服务市场多优化目标出清的平衡可控,并扩展了爬坡节点边际价格的内涵。基于某省级电力实时市场算例分析验证了所提出清模型的有效性。所提出多随机交付场景有助于提升爬坡交付率和采购效率,降低市场价格。
Enhancing the ramping capability of power systems is a crucial measure to address the short-term supply-demand balance issues under a high proportion of renewable energy integration. The ramping ancillary service market has become an important pathway for the optimal allocation of ramping resources. Ensuring the deliverability of reserved ramping capacity
reducing the costs of ramping procurement
and improving the overall operational efficiency of markets are key problems for the future refined operation of ramping ancillary service markets. The Midcontinent Independent System Operator (MISO) in the central United States and California Independent System Operator (CAISO) in the United States have successively conducted the preliminary research and practice on ramping deliverability issues
but problems such as rigid settings of delivering scenarios
limited improvement in delivering rate
and conflicts in multi-objective optimization still exist. Therefore
a clearing model for ramping ancillary service market considering multiple stochastic delivering scenarios is proposed. By setting multiple stochastic delivering scenarios and constructing flexible deliverability constraints
the conflict problems between the adequacy and deliverability of ramping procurement are resolved
achieving the balance and controllability of the multi-objective clearing of the ramping ancillary service market
and extending the connotation of ramping nodal marginal prices. Based on the case analysis of a provincial-level real-time electricity market
the effectiveness of the proposed clearing model is verified. The proposed multiple stochastic delivering scenarios can help improve the ramping delivering ratio and procurement efficiency
reducing the clearing price.
卓振宇 , 张宁 , 谢小荣 , 等 . 高比例可再生能源电力系统关键技术及发展挑战 [J]. 电力系统自动化 , 2021 , 45 ( 9 ): 171 - 191 .
ZHUO Zhenyu , ZHANG Ning , XIE Xiaorong , et al . Key technologies and developing challenges of power system with high proportion of renewable energy [J]. Automation of Electric Power Systems , 2021 , 45 ( 9 ): 171 - 191 .
鲁宗相 , 林弋莎 , 乔颖 , 等 . 极高比例可再生能源电力系统的灵活性供需平衡 [J]. 电力系统自动化 , 2022 , 46 ( 16 ): 3 - 16 .
LU Zongxiang , LIN Yisha , QIAO Ying , et al . Flexibility supply-demand balance in power system with ultra-high proportion of renewable energy [J]. Automation of Electric Power Systems , 2022 , 46 ( 16 ): 3 - 16 .
孙大雁 , 史新红 , 冯树海 , 等 . 全国统一电力市场环境下的电力辅助服务市场体系设计 [J]. 电力系统自动化 , 2024 , 48 ( 4 ): 13 - 24 .
SUN Dayan , SHI Xinhong , FENG Shuhai , et al . Design of auxiliary service market system under national unified electricity market [J]. Automation of Electric Power Systems , 2024 , 48 ( 4 ): 13 - 24 .
张粒子 , 陈皓轩 , 黄弦超 , 等 . 电力交易产品细分市场协同机理研究 [J]. 中国电机工程学报 , 2024 , 44 ( 16 ): 6320 - 6334 .
ZHANG Lizi , CHEN Haoxuan , HUANG Xianchao , et al . Research on the synergistic mechanism of power trading product segments market [J]. Proceedings of the CSEE , 2024 , 44 ( 16 ): 6320 - 6334 .
王蓓蓓 , 丛小涵 , 高正平 , 等 . 高比例新能源接入下电网灵活性爬坡能力市场化获取机制现状分析及思考 [J]. 电网技术 , 2019 , 43 ( 8 ): 2691 - 2702 .
WANG Beibei , CONG Xiaohan , GAO Zhengping , et al . Status analysis and thoughts of market-oriented acquisition mechanism on flexible ramp capability for power grid with high proportion of renewable energy [J]. Power System Technology , 2019 , 43 ( 8 ): 2691 - 2702 .
喻洁 , 刘云仁 , 杨家琪 , 等 . 美国加州辅助服务市场发展解析及其对我国电力市场的启示 [J]. 电网技术 , 2019 , 43 ( 8 ): 2711 - 2717 .
YU Jie , LIU Yenren , YANG Jiaqi , et al . Analysis of development of California ancillary service market and its enlightenment to China’s power market [J]. Power System Technology , 2019 , 43 ( 8 ): 2711 - 2717 .
阳婷婷 , 李晓刚 , 邹斌 , 等 . 促进灵活性资源的辅助服务市场分析 [J]. 电力系统保护与控制 , 2023 , 51 ( 7 ): 73 - 83 .
YANG Tingting , LI Xiaogang , ZOU Bin , et al . Market analysis of an ancillary service to promote flexible resources [J]. Power System Protection and Control , 2023 , 51 ( 7 ): 73 - 83 .
俞鸿飞 , 王韵楚 , 吕瑞扬 , 等 . 考虑灵活爬坡产品的虚拟电厂两阶段分布鲁棒优化运营策略 [J]. 电力系统自动化 , 2024 , 48 ( 14 ): 16 - 27 .
YU Hongfei , WANG Yunchu , LYU Ruiyang , et al . Two-stage distributionally robust optimization operation strategy of virtual power plants considering flexible ramping products [J]. Automation of Electric Power Systems , 2024 , 48 ( 14 ): 16 - 27 .
胡臻 , 刘静 , 张凯 , 等 . 美国爬坡辅助服务市场的需求价格曲线机制分析 [J]. 电力需求侧管理 , 2024 , 26 ( 5 ): 113 - 118 .
HU Zhen , LIU Jing , ZHANG Kai , et al . Demand price curve mechanism in ramping auxiliary service market of USA [J]. Power Demand Side Management , 2024 , 26 ( 5 ): 113 - 118 .
任相霖 , 张粒子 , 黄弦超 . 计及预测误差时变相关特性的新型电力系统爬坡容量需求分析方法 [J]. 南方电网技术 , 2024 , 18 ( 1 ): 49 - 57 .
REN Xianglin , ZHANG Lizi , HUANG Xianchao . Analysis method for ramp capacity demand of new power system considering time-variant correlation characteristics of forecast errors [J]. Southern Power System Technology , 2024 , 18 ( 1 ): 49 - 57 .
赵越 , 蔡秋娜 , 王龙 , 等 . 考虑不同需求弹性的爬坡辅助服务市场出清模型 [J]. 电力系统自动化 , 2024 , 48 ( 5 ): 48 - 57 .
ZHAO Yue , CAI Qiuna , WANG Long , et al . Clearing model for ramping ancillary service market considering various demand elasticities [J]. Automation of Electric Power Systems , 2024 , 48 ( 5 ): 48 - 57 .
胡晓静 , 李慧 , 崔晖 , 等 . 考虑灵活爬坡辅助服务和弃风惩罚的现货电能量市场出清模型 [J]. 电力系统保护与控制 , 2024 , 52 ( 4 ): 133 - 143 .
HU Xiaojing , LI Hui , CUI Hui , et al . Cleaning model of a spot electric energy market considering flexible ramping auxiliary services and wind curtailment penalty [J]. Power System Protection and Control , 2024 , 52 ( 4 ): 133 - 143 .
NESO . Fast reserve tender rules and standard contract terms [EB/OL]. [ 2024-09-24 ]. https://www.neso.energy/document/ 89116/download https://www.neso.energy/document/89116/download .
CAISO . BPM for market operations—CAISO business practice manual change management [EB/OL]. [ 2024-09-30 ]. https://bpmcm.caiso.com/BPM%20Document%20Library/Market%20Operations/BPM_for_Market%20Operations_V97_Redline.pdf https://bpmcm.caiso.com/BPM%20Document%20Library/Market%20Operations/BPM_for_Market%20Operations_V97_Redline.pdf .
MISO . BPM 002 energy and operating reserve markets [EB/OL]. [ 2024-10-24 ]. https://www.misoenergy.org/legal/rules-manuals-and-agreements/business-practice-manuals/ https://www.misoenergy.org/legal/rules-manuals-and-agreements/business-practice-manuals/ .
SPP . RR361-ramp capability products [EB/OL]. [ 2024-02-28 ]. https://www.spp.org/searchq=RR361&t=Documents https://www.spp.org/searchq=RR361&t=Documents .
关于印发《山东电力爬坡辅助服务市场交易规则(试行)》的通知 [EB/OL].[ 2024-02-28 ]. https://sdb.nea.gov.cn/dtyw/tzgg/202402/t20240208_245961.html https://sdb.nea.gov.cn/dtyw/tzgg/202402/t20240208_245961.html .
Notice on the issuance of the “Trading Rules for Shandong Electric Power Ramping Ancillary Service Market (Trial) ”[EB/OL]. [ 2024-02-28 ]. https://sdb.nea.gov.cn/dtyw/tzgg/202402/t20240208_245961.html https://sdb.nea.gov.cn/dtyw/tzgg/202402/t20240208_245961.html .
贵州能源监管办启动电力爬坡辅助服务市场建设 [EB/OL].[ 2024-06-06 ]. https://gzb.nea.gov.cn/dtyw/jgdt/202406/t20240606_264173.html https://gzb.nea.gov.cn/dtyw/jgdt/202406/t20240606_264173.html .
Guizhou Energy Supervision Office started the construction of ramping ancillary service market [EB/OL]. [ 2024-06-06 ]. https://gzb.nea.gov.cn/dtyw/jgdt/202406/t20240606_264173.html https://gzb.nea.gov.cn/dtyw/jgdt/202406/t20240606_264173.html .
SPP . SPP initiative submission form-ramp capability product deliverability [EB/OL]. [ 2024-01-30 ]. https://www.spp.org/documents/70686/sir670%20ramp%20product%20deliverability elc.docx https://www.spp.org/documents/70686/sir670%20ramp%20product%20deliverabilityelc.docx .
甘肃能源监管办关于印发《甘肃省电力辅助服务市场运营规则(试行)》的通知 [EB/OL].[ 2024-01-05 ]. https://gsb.nea.gov.cn/dtyw/tzgg/202309/t20230910_27132.html https://gsb.nea.gov.cn/dtyw/tzgg/202309/t20230910_27132.html .
Notice from Gansu Energy Supervision Office regarding the issuance of the “Operating Rules for Gansu Province Electric Power Ancillary Service Market Operating Rules (Trial) ”[EB/OL]. [ 2024-01-05 ]. https://gsb.nea.gov.cn/dtyw/tzgg/202309/t20230910_27132.html https://gsb.nea.gov.cn/dtyw/tzgg/202309/t20230910_27132.html .
山西能源监管办关于印发《山西正备用辅助服务市场交易实施细则(试行)》的通知 [EB/OL].[ 2024-01-14 ]. https://sxb.nea.gov.cn/xxgk/zcjd/202401/t20240119_227431.html https://sxb.nea.gov.cn/xxgk/zcjd/202401/t20240119_227431.html .
Notice from the Shanxi Energy Supervision Office regarding the issuance of the“Implementation Rules for the Shanxi Reserve Ancillary Service Market Trading (Trial) ”[EB/OL]. [ 2024-01-14 ]. https://sxb.nea.gov.cn/xxgk/zcjd/202401/t20240119_227431.html https://sxb.nea.gov.cn/xxgk/zcjd/202401/t20240119_227431.html .
FANG X , SEDZRO K S , YUAN H Y , et al . Deliverable flexible ramping products considering spatiotemporal correlation of wind generation and demand uncertainties [J]. IEEE Transactions on Power Systems , 2020 , 35 ( 4 ): 2561 - 2574 .
YE H X , LI Z Y . Deliverable robust ramping products in real-time markets [J]. IEEE Transactions on Power Systems , 2018 , 33 ( 1 ): 5 - 18 .
王浩元 , 别朝红 . 考虑不确定性物理边界的灵活爬坡备用分布鲁棒经济调度 [J]. 电力自动化设备 , 2023 , 43 ( 10 ): 59 - 68 .
WANG Haoyuan , BIE Zhaohong . Distributionally robust economic dispatch of flexible ramping reserve considering physical boundaries of uncertainty [J]. Electric Power Automation Equipment , 2023 , 43 ( 10 ): 59 - 68 .
MISO . Ramp product enhancements [EB/OL]. [ 2023-12-01 ]. https://cdn.misoenergy.org/20221201%20MSC%20Item%2006%20Ramp%20Product%20Enhancements627169.pdf https://cdn.misoenergy.org/20221201%20MSC%20Item%2006%20Ramp%20Product%20Enhancements627169.pdf .
CAISO . Flexible ramping product (FRP) refinements—deliverability [EB/OL]. [ 2023-11-29 ]. https://www.caiso.com/documents/presentation-flexible-ramping-product-refinements- deliverability-training.pdf https://www.caiso.com/documents/presentation-flexible-ramping-product-refinements-deliverability-training.pdf .
CHEN Y H , PAN F , QIU F , et al . Security-constrained unit commitment for electricity market: modeling, solution methods, and future challenges [J]. IEEE Transactions on Power Systems , 2023 , 38 ( 5 ): 4668 - 4681 .
CHEN Y S , DWIVEDI R , WAINWRIGHT M J , et al . Fast MCMC sampling algorithms on polytopes [J]. Journal of Machine Learning Research , 2018 , 19 : 1 - 86 .
管金昱 . 数据驱动的大电网智能调度学习优化方法研究及应用 [D]. 合肥 : 合肥工业大学 , 2021 .
GUAN Jinyu . Research and application on intelligent scheduling with data-driven learning optimization method for large power system [D]. Hefei : Hefei University of Technology , 2021 .
刘蓉晖 , 王乐凯 , 孙改平 , 等 . 考虑不确定性的风-光-储合作联盟参与含需求响应的主辅联合市场的竞价交易模型 [J]. 电力系统保护与控制 , 2023 , 51 ( 11 ): 96 - 107 .
LIU Ronghui , WANG Lekai , SUN Gaiping , et al . Bidding transaction model of wind-solar-storage cooperative alliance participating in the main and auxiliary joint market with demand response considering uncertainty [J]. Power System Protection and Control , 2023 , 51 ( 11 ): 96 - 107 .
SINAGA K P , YANG M S . Unsupervised K -means clustering algorithm [J]. IEEE Access , 2020 , 8 : 80716 - 80727 .
甘肃省工信厅 甘肃能源监管办 甘肃省发展改革委 甘肃省能源局关于印发《甘肃电力现货市场规则》的通知 [EB/OL].[ 2024-08-27 ]. https://gxt.gansu.gov.cn/gxt/c107573/202408/173975577.shtml https://gxt.gansu.gov.cn/gxt/c107573/202408/173975577.shtml .
Notice from Gansu Provincial Department of Industry and Information Technology , Gansu Energy Supervision Office , Gansu Provincial Development and Reform Commission , and Gansu Provincial Energy Bureau regarding the issuance of the “Gansu Power Spot Market Rules” [EB/OL]. [ 2024-08-27 ]. https://gxt.gansu.gov.cn/gxt/c107573/202408/173975577.shtml https://gxt.gansu.gov.cn/gxt/c107573/202408/173975577.shtml .
CHANG C T . An efficient linearization approach for mixed-integer problems [J]. European Journal of Operational Research , 2000 , 123 ( 3 ): 652 - 659 .
0
Views
0
下载量
0
CSCD
Publicity Resources
Related Articles
Related Author
Related Institution
京公网安备11010802024621