您当前的位置:
首页 >
文章列表页 >
Substitute Power Product Market Suitable for New Power System —Part Five Negotiated Bidding
Basic Research | 更新时间:2025-09-25
    • Substitute Power Product Market Suitable for New Power System —Part Five Negotiated Bidding

    • Automation of Electric Power Systems   Vol. 49, Issue 17, Pages: 90-100(2025)
    • DOI:10.7500/AEPS20241021002    

      CLC:
    • Received:21 October 2024,

      Revised:2025-04-11,

      Published Online:21 May 2025,

      Published:10 September 2025

    移动端阅览

  • SHI Zhihao,YANG Zaimin,SUN Siyang,et al.Substitute Power Product Market Suitable for New Power System —Part Five Negotiated Bidding[J].Automation of Electric Power Systems,2025,49(17):90-100. DOI: 10.7500/AEPS20241021002.

  •  
  •  

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Substitute Power Product Market Suitable for New Power System—Part Four Transaction Modes and Economic Analysis
Substitute Power Product Market Suitable for New Power System—Part Three System Design

Related Author

XIAO Jucheng
FAN Shuai
HUANG Renke
MENG Yuhang
HE Guangyu
YAN Zheng
LIU Dunnan
LI Zuyi

Related Institution

School of Economic and Management, North China Electric Power University
College of Electrical Engineering, Zhejiang University
Key Laboratory of Control of Power Transmission and Conversion, Ministry of Education (Shanghai Jiao Tong University)
Key Laboratory of Control of Power Transmission and Conversion, Ministry of Education (Shanghai Jiao Tong University)
School of Science and Engineering, The Chinese University of Hong Kong
0