您当前的位置:
首页 >
文章列表页 >
Coordinated Pre-disaster Scheduling of Transmission and Distribution Networks Under Aggregation Feasibility and Frequency Stability Constraints of Distributed Energy Resources
Basic Research | 更新时间:2025-09-25
    • Coordinated Pre-disaster Scheduling of Transmission and Distribution Networks Under Aggregation Feasibility and Frequency Stability Constraints of Distributed Energy Resources

    • Automation of Electric Power Systems   Vol. 49, Issue 16, Pages: 52-61(2025)
    • DOI:10.7500/AEPS20240613009    

      CLC:
    • Received:13 June 2024,

      Revised:2025-03-25,

      Published Online:11 June 2025,

      Published:25 August 2025

    移动端阅览

  • YANG Hongkun,WANG Xu,JIANG Chuanwen,et al.Coordinated Pre-disaster Scheduling of Transmission and Distribution Networks Under Aggregation Feasibility and Frequency Stability Constraints of Distributed Energy Resources[J].Automation of Electric Power Systems,2025,49(16):52-61. DOI: 10.7500/AEPS20240613009.

  •  
  •  

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Collaborative Recovery Strategy Based on Multi-period Anderson Acceleration Under Simultaneous Failures in Transmission and Distribution Network
Coordinated Planning of Centralized and Distributed Battery Energy Storage for Improving Renewable Energy Accommodation Capability
高比例可再生能源电力系统的关键科学问题与理论研究框架

Related Author

YI Boyu
CHEN Yiguang
ZHANG Shaofan
WANG Shouxiang
ZHAO Qianyu
HUANG Yijun
CAI Fulin
HU Zechun

Related Institution

Key Laboratory of the Ministry of Education on Smart Power Grids(Tianjin University)
Tianjin Key Laboratory of Power System Simulation and Control (Tianjin University)
Guangzhou Power Supply Bureau of Guangdong Power Grid Co., Ltd.
Department of Electrical Engineering, Tsinghua University
State Grid Hubei Electric Power Research Institute
0