您当前的位置:
首页 >
文章列表页 >
Optimization Method for Maintenance Decisions on 220 kV Side of Substation Considering Collaboration of Transmission and Distribution
Application Research | 更新时间:2025-06-16
    • Optimization Method for Maintenance Decisions on 220 kV Side of Substation Considering Collaboration of Transmission and Distribution

    • Automation of Electric Power Systems   Vol. 49, Issue 11, Pages: 189-198(2025)
    • DOI:10.7500/AEPS20240605002    

      CLC:
    • Received:05 June 2024,

      Revised:2024-12-30,

      Published Online:20 March 2025,

      Published:10 June 2025

    移动端阅览

  • LI Xinran,TANG Aihong,ZHANG Kanjun,et al.Optimization Method for Maintenance Decisions on 220 kV Side of Substation Considering Collaboration of Transmission and Distribution[J].Automation of Electric Power Systems,2025,49(11):189-198. DOI: 10.7500/AEPS20240605002.

  •  
  •  

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Planning Method for Cyber-Physical Distribution System Considering Spatial-Temporal Flexibility Resource Collaboration
Reasoning Method for Multi-station Cooperative Operation Tickets on Master-station Side Based on Substation State Matrix
Joint Source-Storage-Grid Planning Method Considering Coupling Relationship of Wind Power Curtailment Events

Related Author

WU Shutan
WANG Qi
YU Changping
HU Qinran
SONG Meng
TANG Yi
LI Xinran
TANG Aihong

Related Institution

School of Electrical Engineering, Southeast University
Maintenance Company of State Grid Hubei Electric Power Co., Ltd.
School of Electrical Engineering and Automation, Wuhan University
Key Laboratory of Modern Power System Simulation and Control & Renewable Energy Technology, Ministry of Education(Northeast Electric Power University)
State Grid Jilin Electric Power Supply Company
0