您当前的位置:
首页 >
文章列表页 >
Identification Method for Key Operational Risks of Cascade Hydropower Stations for Integration of Basin Hydro-Wind-Solar Power
Application Research | 更新时间:2025-07-04
    • Identification Method for Key Operational Risks of Cascade Hydropower Stations for Integration of Basin Hydro-Wind-Solar Power

    • Automation of Electric Power Systems   Vol. 49, Issue 12, Pages: 194-207(2025)
    • DOI:10.7500/AEPS20240529009    

      CLC:
    • Received:29 May 2024,

      Revised:2024-12-15,

      Published Online:26 March 2025,

      Published:25 June 2025

    移动端阅览

  • WANG Mingbo,ZHANG Juntao,CAO Hui,et al.Identification Method for Key Operational Risks of Cascade Hydropower Stations for Integration of Basin Hydro-Wind-Solar Power[J].Automation of Electric Power Systems,2025,49(12):194-207. DOI: 10.7500/AEPS20240529009.

  •  
  •  

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Multi-period Online Preventive Control Strategy for Power Grid with High Proportion of Renewable Energy Based on Reinforcement Learning
计及多重不确定性的新能源基地工程输电价格优化模型
Analytical Method for Defense Capability of Large-scale Cascade Hydropower Stations Against Extreme Fluctuations of Renewable Energy in Power Grid
Dual-data-model-driven Distributionally Robust Optimal Scheduling of Renewable Energy Microgrid

Related Author

WANG Mingbo
ZHANG Juntao
CAO Hui
JIANG Tao
QIE Zhaohui
LI Wei
LI Zhaowei
WU Xuelian

Related Institution

Key Laboratory of Modern Power System Simulation and Control & Renewable Energy Technology, Ministry of Education (Northeast Electric Power University)
State Grid Electric Power Research Institute (NARI Group Corporation)
Institute of Hydropower and Hydroinformatics, Dalian University of Technology
Three Gorges Cascade Dispatch and Communication Center
0