您当前的位置:
首页 >
文章列表页 >
Construction Method for Probability-based Feasible Region of Virtual Power Plant Considering Uncertainty of Distributed Renewable Energy Output
Special Session on Virtual Power Plant with Enormous Flexible Resources | 更新时间:2025-06-16
    • Construction Method for Probability-based Feasible Region of Virtual Power Plant Considering Uncertainty of Distributed Renewable Energy Output

    • Automation of Electric Power Systems   Vol. 48, Issue 18, Pages: 129-138(2024)
    • DOI:10.7500/AEPS20240407002    

      CLC:
    • Received:07 April 2024,

      Revised:2024-06-13,

      Published Online:12 August 2024,

      Published:25 September 2024

    移动端阅览

  • JIAO Zhijie,WANG Xiaojun,LIU Zhao,et al.Construction Method for Probability-based Feasible Region of Virtual Power Plant Considering Uncertainty of Distributed Renewable Energy Output[J].Automation of Electric Power Systems,2024,48(18):129-138. DOI: 10.7500/AEPS20240407002.

  •  
  •  

0

Views

0

下载量

3

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Dynamic Construction and Response Demonstration of Virtual Power Plant with Aggregated Large-scale 5G Base Stations
含电动汽车的虚拟电厂鲁棒随机优化调度
基于投资组合的虚拟电厂多电源容量配置
含风光水的虚拟电厂与配电公司协调调度模型

Related Author

GAO Hongchao
LI Chuyi
WANG Guanxiong
JIN Tai
HU Jiye
ZHU Jingkai
CHEN Qixin
KANG Chongqing

Related Institution

National Key Laboratory of New Power System Operation and Control (Tsinghua University)
Tsinghua Sichuan Energy Internet Research Institute
Beijing Chuangzhixinke Technology Co., Ltd.
State Grid Shanghai Municipal Electric Power Company
College of Energy and Electrical Engineering, Hohai University
0