您当前的位置:
首页 >
文章列表页 >
Solution Method of Regulation Boundary for Industrial Park Virtual Power Plant Considering Power Network Constraints
Special Session on Virtual Power Plant with Enormous Flexible Resources | 更新时间:2025-06-16
    • Solution Method of Regulation Boundary for Industrial Park Virtual Power Plant Considering Power Network Constraints

    • Automation of Electric Power Systems   Vol. 48, Issue 18, Pages: 66-75(2024)
    • DOI:10.7500/AEPS20231206002    

      CLC:
    • Received:06 December 2023,

      Revised:2024-02-27,

      Published Online:29 May 2024,

      Published:25 September 2024

    移动端阅览

  • LIAO Siyang,HE Cong,LI Lingfang,et al.Solution Method of Regulation Boundary for Industrial Park Virtual Power Plant Considering Power Network Constraints[J].Automation of Electric Power Systems,2024,48(18):66-75. DOI: 10.7500/AEPS20231206002.

  •  
  •  

0

Views

0

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Current Status and Architecture Design of Standardization for Virtual Power Plants
Multi-time-scale Collaborative Optimization Strategy for Shared Storage Capacity Considering Coupling of Hydro-Electric Risk

Related Author

LI Lingfang
WANG Di
AI Qian
YU Tao
ZUO Juan
LU Yi
LI Jiamei
WANG Wenbo

Related Institution

Key Laboratory of Control of Power Transmission and Conversion, Ministry of Education (Shanghai Jiao Tong University)
State Grid Shanghai Municipal Electric Power Company
State Grid Shanghai Energy Interconnection Research Institute Co., Ltd.
College of Electrical Engineering, Zhejiang University
Ningbo Power Supply Company of State Grid Zhejiang Electric Power Co., Ltd.
0