Dynamic Construction and Response Demonstration of Virtual Power Plant with Aggregated Large-scale 5G Base Stations
Special Session on Virtual Power Plant with Enormous Flexible Resources | 更新时间:2025-06-16
    • Dynamic Construction and Response Demonstration of Virtual Power Plant with Aggregated Large-scale 5G Base Stations

    • Automation of Electric Power Systems   Vol. 48, Issue 18, Pages: 47-55(2024)
    • DOI:10.7500/AEPS20231003001    

      CLC:
    • Received:03 October 2023,

      Revised:2024-02-02,

      Published Online:08 April 2024,

      Published:25 September 2024

    移动端阅览

  • GAO Hongchao,LI Chuyi,WANG Guanxiong,et al.Dynamic Construction and Response Demonstration of Virtual Power Plant with Aggregated Large-scale 5G Base Stations[J].Automation of Electric Power Systems,2024,48(18):47-55. DOI: 10.7500/AEPS20231003001.

  •  
  •  

0

Views

0

下载量

3

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Day-ahead Interactive Operation Method for Distribution Network and 5G Base Stations Based on Inter-station Migration of Communication Load
Zonotope-based Wide-area Aggregation and Regulation Method for Distributed Resources in Virtual Power Plant
Construction Method for Probability-based Feasible Region of Virtual Power Plant Considering Uncertainty of Distributed Renewable Energy Output

Related Author

KANG Chongqing
WANG Di
AI Qian
YU Tao
ZUO Juan
LU Yi
LI Jiamei
LIU Hong

Related Institution

Key Laboratory of Control of Power Transmission and Conversion, Ministry of Education (Shanghai Jiao Tong University)
State Grid Shanghai Energy Interconnection Research Institute Co., Ltd.
Key Laboratory of the Ministry of Education on Smart Power Grids (Tianjin University)
Georgia Tech Shenzhen College, Tianjin University
School of Electrical Engineering, Southeast University
0