浏览全部资源
扫码关注微信
1.华北电力大学电气与电子工程学院,北京市 102206
2.国网经济技术研究院有限公司,北京市 102209
Received:25 September 2023,
Revised:2024-01-12,
Published Online:20 June 2024,
Published:10 August 2024
移动端阅览
路帅超,孙英云,赵鹏飞等.新型电力系统多阶段输-储协同分布鲁棒规划[J].电力系统自动化,2024,48(15):15-24.
LU Shuaichao,SUN Yingyun,ZHAO Pengfei,et al.Multi-stage Transmission-Storage Cooperative Distributionally Robust Planning for New Power System[J].Automation of Electric Power Systems,2024,48(15):15-24.
路帅超,孙英云,赵鹏飞等.新型电力系统多阶段输-储协同分布鲁棒规划[J].电力系统自动化,2024,48(15):15-24. DOI: 10.7500/AEPS20230925002.
LU Shuaichao,SUN Yingyun,ZHAO Pengfei,et al.Multi-stage Transmission-Storage Cooperative Distributionally Robust Planning for New Power System[J].Automation of Electric Power Systems,2024,48(15):15-24. DOI: 10.7500/AEPS20230925002.
在电力系统中长期规划中,可再生能源发展受到政策变迁、关键技术发展和气候变化等因素的影响,具有不确定性。这一不确定性将对短期规划决策产生不可忽视的影响。针对以上问题,在可再生能源发展场景树之间嵌套距离的基础上引入鲁棒因子,构建概率分布模糊集。随后,综合考察整个规划周期规划方案的经济性与鲁棒性,建立了考虑可再生能源出力不确定性与发展不确定性的电力系统多阶段输-储协同分布鲁棒规划模型,并采用列与约束生成算法对模型进行求解。最后,采用Garver-6节点系统和HRP-38标准测试系统进行算例分析,得到多阶段规划方案。通过调节鲁棒因子可以平衡模型的经济性与鲁棒性,证明了所提方法的有效性。
In the medium- and long-term planning of the power system
the development of renewable energy is affected by factors such as policy changes
key technology development and climate changes
and has uncertainties. The uncertainty will have a significant impact on short-term planning decisions. To solve the above problems
a probability distribution ambiguity set is constructed by introducing a robustness factor based on nested distance between renewable energy development scenario trees. Subsequently
considering the economy and robustness of the planning scheme in the whole planning cycle
a multi-stage transmission-storage cooperative distributionally robust planning model for the power system is established considering the output and development uncertainties of the renewable energy
and the column-and-constraint generation (C&CG) algorithm is used to solve the model. Finally
the Garver-6-bus system and HRP-38 standard test system are used for case analysis
and the multi-stage planning schemes for these systems are obtained. The economy and robustness of the model can be balanced flexibly by adjusting the robustness factor
which proves the effectiveness of the proposed method.
国家电网有限公司 .“ 碳达峰、碳中和”行动方案 [EB/OL].[ 2023-03-01 ]. http://www.sasac.gov.cn/n2588025/n2588124/c17342704/con-tent.html http://www.sasac.gov.cn/n2588025/n2588124/c17342704/con-tent.html .
State Grid Corporation of China . “ Carbon peak emission and carbon neutrality” action plan [EB/OL]. [ 2023-03-01 ]. http://www.sasac.gov.cn/n258802-5/n2588124/c17342704/content.html http://www.sasac.gov.cn/n258802-5/n2588124/c17342704/content.html .
国家发展和改革委员会 . “十四五”现代能源体系规划 [EB/OL].[ 2023-03-22 ]. https://www.ndrc.gov.cn/xwdt/tzgg/202203/P020220322583239614565.pdf https://www.ndrc.gov.cn/xwdt/tzgg/202203/P020220322583239614565.pdf .
National Development and Reform Commission . The “14th Five-Year Plan” for modern energy system [EB/OL]. [ 2023-03-22 ]. https://www.ndrc.gov.cn/xwdt/tzgg/202203/P020220322583239614565.pdf https://www.ndrc.gov.cn/xwdt/tzgg/202203/P020220322583239614565.pdf .
国家发展和改革委员会 . “十四五”可再生能源发展规划 [EB/OL].[ 2023-10-21 ]. https://www.ndrc.gov.cn/xxgk/zcfb/ghwb/20-2206/P020220602315308557623.pdf https://www.ndrc.gov.cn/xxgk/zcfb/ghwb/20-2206/P020220602315308557623.pdf .
National Development and Reform Commission . The “14th Five-Year Plan” for renewable energy development [EB/OL]. [ 2023-10-21 ]. https://www.ndrc.gov.cn/xxgk/zcfb/ghwb/202206/P020220602315308557623.pdf https://www.ndrc.gov.cn/xxgk/zcfb/ghwb/202206/P020220602315308557623.pdf .
赵冬梅 , 王浩翔 , 陶然 . 计及风电-负荷不确定性的风-火-核-碳捕集多源协调优化调度 [J]. 电工技术学报 , 2022 , 37 ( 3 ): 707 - 718 .
ZHAO Dongmei , WANG Haoxiang , TAO Ran . A multisource coordinated optimal scheduling model considering wind-load uncertainty [J]. Transactions of China Electrotechnical Society , 2022 , 37 ( 3 ): 707 - 718 .
侯金鸣 , 孙蔚 , 肖晋宇 , 等 . 电力系统关键技术进步与低碳转型的协同优化 [J]. 电力系统自动化 , 2022 , 46 ( 13 ): 1 - 9 .
HOU Jinming , SUN Wei , XIAO Jinyu , et al . Collaborative optimization of key technology progress and low-carbon transition of power systems [J]. Automation of Electric Power Systems , 2022 , 46 ( 13 ): 1 - 9 .
黎博 , 陈民铀 , 钟海旺 , 等 . 高比例可再生能源新型电力系统长期规划综述 [J]. 中国电机工程学报 , 2023 , 43 ( 2 ): 555 - 580 .
LI Bo , CHEN Minyou , ZHONG Haiwang , et al . A review of long-term planning of new power systems with large share of renewable energy [J]. Proceedings of the CSEE , 2023 , 43 ( 2 ): 555 - 580 .
魏泓屹 , 卓振宇 , 张宁 , 等 . 中国电力系统碳达峰·碳中和转型路径优化与影响因素分析 [J]. 电力系统自动化 , 2022 , 46 ( 19 ): 1 - 12 .
WEI Hongyi , ZHUO Zhenyu , ZHANG Ning , et al . Transition path optimization and influencing factor analysis of carbon emission peak and carbon neutrality for power system of China [J]. Automation of Electric Power Systems , 2022 , 46 ( 19 ): 1 - 12 .
刘盾盾 , 程浩忠 , 刘佳 , 等 . 输电网鲁棒规划研究综述与展望 [J]. 电网技术 , 2019 , 43 ( 1 ): 135 - 143 .
LIU Dundun , CHENG Haozhong , LIU Jia , et al . Review and prospects of robust transmission expansion planning [J]. Power System Technology , 2019 , 43 ( 1 ): 135 - 143 .
张衡 , 程浩忠 , 曾平良 , 等 . 基于随机优化理论的输电网规划研究综述 [J]. 电网技术 , 2017 , 41 ( 10 ): 3121 - 3129 .
ZHANG Heng , CHENG Haozhong , ZENG Pingliang , et al . Overview of transmission network expansion planning based on stochastic optimization [J]. Power System Technology , 2017 , 41 ( 10 ): 3121 - 3129 .
柳璐 , 程浩忠 , 吴耀武 , 等 . 面向高比例可再生能源的输电网规划方法研究进展与展望 [J]. 电力系统自动化 , 2021 , 45 ( 13 ): 176 - 183 .
LIU Lu , CHENG Haozhong , WU Yaowu , et al . Research progress and prospects of transmission expansion planning method for high proportion of renewable energy [J]. Automation of Electric Power Systems , 2021 , 45 ( 13 ): 176 - 183 .
QORBANI M , AMRAEE T . Long term transmission expansion planning to improve power system resilience against cascading outages [J]. Electric Power Systems Research , 2021 , 192 : 106972 .
LATORRE G , CRUZ R D , AREIZA J M , et al . Classification of publications and models on transmission expansion planning [J]. IEEE Transactions on Power Systems , 2003 , 18 ( 2 ): 938 - 946 .
LEI Y , WANG D , JIA H J , et al . Multi-stage stochastic planning of regional integrated energy system based on scenario tree path optimization under long-term multiple uncertainties [J]. Applied Energy , 2021 , 300 : 117224 .
王鹏 , 魏招毅 , 周保荣 , 等 . 考虑火电有序退役的源-网-储协同多阶段规划方法 [J]. 中国电机工程学报 , 2024 , 44 ( 4 ): 1386 - 1397 .
WANG Peng , WEI Zhaoyi , ZHOU Baorong , et al . Multi-stage planning method for source-grid-storage coordination considering the orderly decommissioning of thermal power [J]. Proceedings of the CSEE , 2024 , 44 ( 4 ): 1386 - 1397 .
SUN X H , CAO X Y , ZENG B , et al . Multistage dynamic planning of integrated hydrogen-electrical microgrids under multiscale uncertainties [J]. IEEE Transactions on Smart Grid , 2023 , 14 ( 5 ): 3482 - 3498 .
IOANNOU A , FUZULI G , BRENNAN F , et al . Multi-stage stochastic optimization framework for power generation system planning integrating hybrid uncertainty modelling [J]. Energy Economics , 2019 , 80 : 760 - 776 .
丁涛 , 李澄 , 胡源 , 等 . 考虑非预期条件的电力系统多阶段随机规划建模理论与方法 [J]. 电网技术 , 2017 , 41 ( 11 ): 3566 - 3573 .
DING Tao , LI Cheng , HU Yuan , et al . Multi-stage stochastic programming for power system planning considering nonanticipative constraints [J]. Power System Technology , 2017 , 41 ( 11 ): 3566 - 3573 .
贺帅佳 , 阮贺彬 , 高红均 , 等 . 分布鲁棒优化方法在电力系统中的理论分析与应用综述 [J]. 电力系统自动化 , 2020 , 44 ( 14 ): 179 - 191 .
HE Shuaijia , RUAN Hebin , GAO Hongjun , et al . Overview on theory analysis and application of distributionally robust optimization method in power system [J]. Automation of Electric Power Systems , 2020 , 44 ( 14 ): 179 - 191 .
童宇轩 , 胡俊杰 , 刘雪涛 , 等 . 新能源电力系统灵活性供需量化及分布鲁棒优化调度 [J]. 电力系统自动化 , 2023 , 47 ( 15 ): 80 - 90 .
TONG Yuxuan , HU Junjie , LIU Xuetao , et al . Quantification of flexibility supply and demand and distributionally robust optimal dispatch of renewable energy dominated power systems [J]. Automation of Electric Power Systems , 2023 , 47 ( 15 ): 80 - 90 .
DING T , ZHANG X S , LU R Z , et al . Multi-stage distributionally robust stochastic dual dynamic programming to multi-period economic dispatch with virtual energy storage [J]. IEEE Transactions on Sustainable Energy , 2022 , 13 ( 1 ): 146 - 158 .
赵毅 , 王维庆 , 闫斯哲 . 考虑阶梯型碳交易的风光储联合系统分布鲁棒优化调度 [J]. 电力系统保护与控制 , 2023 , 51 ( 6 ): 127 - 136 .
ZHAO Yi , WANG Weiqing , YAN Sizhe . Distributionally robust optimization scheduling of a joint wind-solar-storage system considering step-type carbon trading [J]. Power System Protection and Control , 2023 , 51 ( 6 ): 127 - 136 .
CABRAL F G , DA COSTA B F P . Nested distance for stagewise-independent processes [EB/OL]. [ 2023-04-01 ]. http://arxiv.org/abs/1711.10633.pdf http://arxiv.org/abs/1711.10633.pdf .
CH PFLUG G . Multistage stochastic decision problems: approximation by recursive structures and ambiguity modeling [J]. European Journal of Operational Research , 2023 , 306 ( 3 ): 1027 - 1039 .
董骁翀 , 孙英云 , 蒲天骄 , 等 . 一种基于Wasserstein距离及有效性指标的最优场景约简方法 [J]. 中国电机工程学报 , 2019 , 39 ( 16 ): 4650 - 4658 .
DONG Xiaochong , SUN Yingyun , PU Tianjiao , et al . An optimal scenario reduction method based on Wasserstein distance and validity index [J]. Proceedings of the CSEE , 2019 , 39 ( 16 ): 4650 - 4658 .
ZHAO P F , XU X Z , DONG X C , et al . An adaptive decision-making approach for transmission expansion planning considering risk assessment of renewable energy extreme scenarios [J]. IET Generation , Transmission & Distribution, 2023 , 17 ( 18 ): 4107 - 4118 .
VILLASANA R , GARVER L L , SALON S J . Transmission network planning using linear programming [J]. IEEE Transactions on Power Apparatus and Systems , 1985 , 104 ( 2 ): 349 - 356 .
ZHUO Z , ZHANG N , YANG J , et al . Transmission expansion planning test system for AC/DC hybrid grid with high variable renewable energy penetration [J]. IEEE Transactions on Power Systems , 2019 , 35 ( 4 ): 2597 - 2608 .
0
Views
0
下载量
4
CSCD
Publicity Resources
Related Articles
Related Author
Related Institution
京公网安备11010802024621