刘玉玲,张峰,张刚等.考虑分布式电源的配电网灾中-灾后两阶段协同韧性恢复决策[J].电力系统自动化,2024,48(2):48-59.
LIU Yuling,ZHANG Feng,ZHANG Gang,et al.In- and Post-disaster Two-stage Coordinated Resilience Recovery Decision of Distribution Network Considering Distributed Generators[J].Automation of Electric Power Systems,2024,48(2):48-59.
刘玉玲,张峰,张刚等.考虑分布式电源的配电网灾中-灾后两阶段协同韧性恢复决策[J].电力系统自动化,2024,48(2):48-59. DOI: 10.7500/AEPS20230627013.
LIU Yuling,ZHANG Feng,ZHANG Gang,et al.In- and Post-disaster Two-stage Coordinated Resilience Recovery Decision of Distribution Network Considering Distributed Generators[J].Automation of Electric Power Systems,2024,48(2):48-59. DOI: 10.7500/AEPS20230627013.
频繁的极端自然灾害极易引发配电网大规模故障,基于分布式电源的负荷恢复是提高配电网韧性水平的重要手段。然而,现有研究一般将灾中和灾后阶段进行独立决策,忽略了二者决策的连续性和耦合性,延缓了恢复进程。为此,文中提出一种基于灾中-灾后两阶段协同决策的配电网快速恢复方法,充分考虑灾中-灾后过程中的相互作用,综合分布式电源调度、网络拓扑改变、维修人员调度等在内的恢复措施,保障灾中-灾后阶段连续决策的最优性。首先,考虑灾后供能路径对灾中网络拓扑的需求关系,建立灾中阶段以分布式电源为核心的拓扑调整模型与负荷元胞恢复模型,实现部分重要负荷的供电;其次,考虑灾中决策对灾后恢复的影响,建立灾后阶段故障维修人员调度和负荷快速恢复的联合决策模型,实现所有负荷的有序恢复;然后,以灾中-灾后全阶段失负荷量最小为目标,实现灾中-灾后恢复的协同决策;最后,基于IEEE 123节点配电系统验证了所提模型的有效性。
Frequent extreme natural disasters are highly likely to cause large-scale faults in the distribution network
and the distributed generator (DG) based load recovery is an important means to improve the resilience level of the distribution network. However
existing studies generally make independent decisions during the in- and post-disaster stages
while neglecting the continuity and coupling of the two decisions
and slowing down the recovery process. Therefore
this paper proposes a fast recovery method for the distribution network based on the in- and post-disaster two-stage coordinated decisions
which fully considers the interactions between the in- and post-disaster processes
and integrates the recovery measures including DG scheduling
network topology change
and maintenance personnel scheduling to guarantee the optimality of the consecutive decisions during the in- and post-disaster stages. Firstly
considering the demand relationship between post-disaster energy supply path and the in-disaster network topology
the topology adjustment model with DG as the core and the cellular load recovery model are established during the in-disaster stage to achieve the power supply for partial important loads. Secondly
considering the impact of the in-disaster decisions on the post-disaster recovery
a joint decision-making model for the fault maintenance personnel scheduling and fast load recovery is established during the post-disaster stage to achieve orderly recovery of all loads. Then
with the objective of minimizing the loss of load during the in- and post-disaster stages
the coordinated decision-making for the in- and post-disaster recovery is achieved. Finally
the validity of the proposed model is verified through an IEEE 123-bus distribution system.
别朝红 , 林雁翎 , 邱爱慈 . 弹性电网及其恢复力的基本概念与研究展望 [J]. 电力系统自动化 , 2015 , 39 ( 22 ): 1 - 9 .
BIE Zhaohong , LIN Yanling , QIU Aici . Concept and research prospects of power system resilience [J]. Automation of Electric Power Systems , 2015 , 39 ( 22 ): 1 - 9 .
ZHANG G , ZHANG F , ZHANG X , et al . Mobile emergency generator planning in resilient distribution systems: a three-stage stochastic model with nonanticipativity constraints [J]. IEEE Transactions on Smart Grid , 2020 , 11 ( 6 ): 4847 - 4859 .
周晓敏 , 葛少云 , 李腾 , 等 . 极端天气条件下的配电网韧性分析方法及提升措施研究 [J]. 中国电机工程学报 , 2018 , 38 ( 2 ): 505 - 513 .
ZHOU Xiaomin , GE Shaoyun , LI Teng , et al . Assessing and boosting resilience of distribution system under extreme weather [J]. Proceedings of the CSEE , 2018 , 38 ( 2 ): 505 - 513 .
许寅 , 和敬涵 , 王颖 , 等 . 韧性背景下的配网故障恢复研究综述及展望 [J]. 电工技术学报 , 2019 , 34 ( 16 ): 3416 - 3429 .
XU Yin , HE Jinghan , WANG Ying , et al . A review on distribution system restoration for resilience enhancement [J]. Transactions of China Electrotechnical Society , 2019 , 34 ( 16 ): 3416 - 3429 .
王江波 , 胡勤才 , 苟爱萍 . 灾后城市基础设施恢复力模型构建研究——以“7·20”郑州特大暴雨灾害为例 [J]. 灾害学 , 2023 , 38 ( 1 ): 32 - 36 .
WANG Jiangbo , HU Qincai , GOU Aiping . A resilience rapidity model for post-disaster infrastructure—an illustrative case at “7·20” Zhengzhou torrential rain disaster [J]. Journal of Catastrophology , 2023 , 38 ( 1 ): 32 - 36 .
BIE Z H , LIN Y L , LI G F , et al . Battling the extreme: a study on the power system resilience [J]. Proceedings of the IEEE , 2017 , 105 ( 7 ): 1253 - 1266 .
WANG Y Z , CHEN C , WANG J H , et al . Research on resilience of power systems under natural disasters—a review [J]. IEEE Transactions on Power Systems , 2016 , 31 ( 2 ): 1604 - 1613 .
别朝红 , 林超凡 , 李更丰 , 等 . 能源转型下弹性电力系统的发展与展望 [J]. 中国电机工程学报 , 2020 , 40 ( 9 ): 2735 - 2744 .
BIE Zhaohong , LIN Chaofan , LI Gengfeng , et al . Development and prospect of resilient power system in the context of energy transition [J]. Proceedings of the CSEE , 2020 , 40 ( 9 ): 2735 - 2744 .
ZHANG G , ZHANG F , ZHANG X , et al . A multi-disaster-scenario distributionally robust planning model for enhancing the resilience of distribution systems [J]. International Journal of Electrical Power & Energy Systems , 2020 , 122 : 106161 .
汪寅乔 . 台风环境下电力系统多源协调调度研究 [D]. 哈尔滨 : 哈尔滨工业大学 , 2020 .
WANG Yinqiao . Research on multi-source coordinated dispatching of power system in typhoon environment [D]. Harbin : Harbin Institute of Technology , 2020 .
CHEN C , WANG J H , QIU F , et al . Resilient distribution system by microgrids formation after natural disasters [J]. IEEE Transactions on Smart Grid , 2016 , 7 ( 2 ): 958 - 966 .
CHEN B , CHEN C , WANG J H , et al . Sequential service restoration for unbalanced distribution systems and microgrids [J]. IEEE Transactions on Power Systems , 2018 , 33 ( 2 ): 1507 - 1520 .
DING T , WANG Z K , QU M , et al . A sequential black-start restoration model for resilient active distribution networks [J]. IEEE Transactions on Power Systems , 2022 , 37 ( 4 ): 3133 - 3136 .
ARIF A , WANG Z Y , WANG J H , et al . Power distribution system outage management with co-optimization of repairs, reconfiguration, and DG dispatch [J]. IEEE Transactions on Smart Grid , 2018 , 9 ( 5 ): 4109 - 4118 .
ZHANG G , ZHANG F , ZHANG X , et al . Sequential disaster recovery model for distribution systems with co-optimization of maintenance and restoration crew dispatch [J]. IEEE Transactions on Smart Grid , 2020 , 11 ( 6 ): 4700 - 4713 .
HAGHSHENAS M , HOOSHMAND R A , GHOLIPOUR M . Power distribution system resilience enhancement planning against extreme dust storms via pre- and post-event actions considering uncertainties [J]. Sustainable Cities and Society , 2022 , 78 : 103626 .
GHASEMI M , KAZEMI A , BOMPARD E , et al . A two-stage resilience improvement planning for power distribution systems against hurricanes [J]. International Journal of Electrical Power & Energy Systems , 2021 , 132 : 107214 .
LIU J C , YU Y X , QIN C . Unified two-stage reconfiguration method for resilience enhancement of distribution systems [J]. IET Generation , Transmission & Distribution, 2019 , 13 ( 9 ): 1734 - 1745 .
TAO R , ZHAO D M , WANG H X , et al . Multi-stage defender-attacker-defender model for distribution system resilience enhancement in ice storms with line hardening, mobile device and repair crew dispatching [J]. CSEE Journal of Power and Energy Systems , 2022 , 9 ( 3 ): 1103 - 1118 .
葛少云 , 张成昊 , 刘洪 , 等 . 考虑微能源网支撑作用的配电网弹性提升策略 [J]. 电网技术 , 2019 , 43 ( 7 ): 2306 - 2313 .
GE Shaoyun , ZHANG Chenghao , LIU Hong , et al . Resilience enhancement strategy for distribution network considering supporting role of micro energy grid [J]. Power System Technology , 2019 , 43 ( 7 ): 2306 - 2313 .
张亚超 , 谢仕炜 . 面向配电网弹性提升的多时间尺度恢复策略协调优化框架 [J]. 电力系统自动化 , 2021 , 45 ( 18 ): 28 - 34 .
ZHANG Yachao , XIE Shiwei . Coordinated optimization framework of multi-timescale restoration strategies for resilience enhancement of distribution networks [J]. Automation of Electric Power Systems , 2021 , 45 ( 18 ): 28 - 34 .
GHASEMI M , KAZEMI A , MAZZA A , et al . A three-stage stochastic planning model for enhancing the resilience of distribution systems with microgrid formation strategy [J]. IET Generation , Transmission & Distribution, 2021 , 15 ( 13 ): 1908 - 1921 .
焦嘉凝 , 柳璐 , 张天宇 , 等 . 台风灾害下多阶段协同的受端电网弹性提升策略 [J]. 电力系统自动化 , 2023 , 47 ( 12 ): 9 - 18 .
JIAO Jianing , LIU Lu , ZHANG Tianyu , et al . Resilience enhancement strategy with multi-stage collaboration for receiving-end grid under typhoon disaster [J]. Automation of Electric Power Systems , 2023 , 47 ( 12 ): 9 - 18 .
KIM Y J , WANG J H , LU X N . A framework for load service restoration using dynamic change in boundaries of advanced microgrids with synchronous-machine DGs [J]. IEEE Transactions on Smart Grid , 2018 , 9 ( 4 ): 3676 - 3690 .
DU Y H , TU H , LU X N , et al . Black-start and service restoration in resilient distribution systems with dynamic microgrids [J]. IEEE Journal of Emerging and Selected Topics in Power Electronics , 2022 , 10 ( 4 ): 3975 - 3986 .
黄杏 , 金新民 , 马琳 . 微网离网黑启动优化控制方案 [J]. 电工技术学报 , 2013 , 28 ( 4 ): 182 - 190 .
HUANG Xin , JIN Xinmin , MA Lin . An optimized island micro-grid black-start control method [J]. Transactions of China Electrotechnical Society , 2013 , 28 ( 4 ): 182 - 190 .
谢云云 , 杨正婷 , 蔡胜 , 等 . 基于鲁棒模型预测控制的配电网供电恢复策略 [J]. 电力系统自动化 , 2021 , 45 ( 23 ): 123 - 131 .
XIE Yunyun , YANG Zhengting , CAI Sheng , et al . Power supply restoration strategy for distribution network based on robust model prediction control [J]. Automation of Electric Power Systems , 2021 , 45 ( 23 ): 123 - 131 .
刘仲 , 牟龙华 , 许旭锋 . 微电网黑启动中考虑负荷恢复优化的分布式电源恢复方案 [J]. 电力自动化设备 , 2016 , 36 ( 3 ): 46 - 52 .
LIU Zhong , MU Longhua , XU Xufeng . Microgrid black-start considering DG startup sequence and load restoration optimization [J]. Electric Power Automation Equipment , 2016 , 36 ( 3 ): 46 - 52 .