您当前的位置:
首页 >
文章列表页 >
In- and Post-disaster Two-stage Coordinated Resilience Recovery Decision of Distribution Network Considering Distributed Generators
Basic Research | 更新时间:2025-06-16
    • In- and Post-disaster Two-stage Coordinated Resilience Recovery Decision of Distribution Network Considering Distributed Generators

    • Automation of Electric Power Systems   Vol. 48, Issue 2, Pages: 48-59(2024)
    • DOI:10.7500/AEPS20230627013    

      CLC:
    • Received:27 June 2023,

      Revised:2023-08-09,

      Published Online:08 December 2023,

      Published:25 January 2024

    移动端阅览

  • LIU Yuling,ZHANG Feng,ZHANG Gang,et al.In- and Post-disaster Two-stage Coordinated Resilience Recovery Decision of Distribution Network Considering Distributed Generators[J].Automation of Electric Power Systems,2024,48(2):48-59. DOI: 10.7500/AEPS20230627013.

  •  
  •  

0

Views

0

下载量

4

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Optimal Decision-making Method for Multi-period Load Restoration in Distribution Network with Coordination of Multiple Sources
Synchronous Measurement Data-driven Classification Method for Disturbance Sources in Distribution Networks
Anti-islanding Protection Method Based on Magnitude Ratio of Inspection Signal to Power Frequency Voltage

Related Author

Yin XU
Ying WANG
Jinghan HE
Chen LI
CHEN Zhilin
LIU Hao
BI Tianshu
XU Huabo

Related Institution

School of Electrical Engineering, Beijing Jiaotong University
State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources (North China Electric Power University)
School of Electrical and Electronic Engineering, Shandong University of Technology
Electric Power Dispatch and Control Center, Guangdong Power Grid Co., Ltd.
School of Intelligent Manufacturing, Zibo Vocational Institute
0