您当前的位置:
首页 >
文章列表页 >
Stochastic Robust Operation Optimization for Park-level Integrated Energy System in Multi-stakeholder Market
Invited Paper | 更新时间:2025-06-16
    • Stochastic Robust Operation Optimization for Park-level Integrated Energy System in Multi-stakeholder Market

    • Automation of Electric Power Systems   Vol. 47, Issue 24, Pages: 100-109(2023)
    • DOI:10.7500/AEPS20230515002    

      CLC:
    • Received:15 May 2023,

      Revised:2023-08-20,

      Published Online:10 November 2023,

      Published:25 December 2023

    移动端阅览

  • ZHOU Lihong,YU Hao,LI Peng,et al.Stochastic Robust Operation Optimization for Park-level Integrated Energy System in Multi-stakeholder Market[J].Automation of Electric Power Systems,2023,47(24):100-109. DOI: 10.7500/AEPS20230515002.

  •  
  •  

0

Views

0

下载量

3

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Research Status and Prospect of Distributed Generation Hosting Capacity Assessment for Distribution Network
Optimal Scheduling Strategy of Farm Distribution Network for Power Supply Support for Production of Large-scale Crop Base
Multi-dimensional Resilience Enhancement Strategy for Distribution Network During Typhoon Based on Improved Normal Constraints Method

Related Author

LU Zimeng
LIAO Yuming
YANG Lei
LIU Wenlong
NIAN Heng
KONG Lingda
LIU Hong
CAO Ruizhi

Related Institution

College of Electrical Engineering, Zhejiang University
State Grid Shanghai Energy Interconnection Research Institute Co., Ltd.
Key Laboratory of the Ministry of Education on Smart Power Grids (Tianjin University)
State Grid Jiangsu Economic Research Institute
School of Electrical Engineering and Automation, Harbin Institute of Technology
0