您当前的位置:
首页 >
文章列表页 >
Coordinated Clearing Method for Two-stage Inter- and Intra-provincial Electricity Spot Market Under Spillover Risk Constraints
Special Topic on Construction of Electricity Market System | 更新时间:2025-06-16
    • Coordinated Clearing Method for Two-stage Inter- and Intra-provincial Electricity Spot Market Under Spillover Risk Constraints

    • Automation of Electric Power Systems   Vol. 48, Issue 4, Pages: 66-75(2024)
    • DOI:10.7500/AEPS20230509011    

      CLC:
    • Received:09 May 2023,

      Revised:2023-09-18,

      Published:25 February 2024

    移动端阅览

  • WU Wenqi,XIAO Yunpeng,WANG Xiuli,et al.Coordinated Clearing Method for Two-stage Inter- and Intra-provincial Electricity Spot Market Under Spillover Risk Constraints[J].Automation of Electric Power Systems,2024,48(4):66-75. DOI: 10.7500/AEPS20230509011.

  •  
  •  

0

Views

0

下载量

4

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Substitute Power Product Market Suitable for New Power System—Part Two Product Form and Its Formation Mechanism
Analysis and Enlightenment of Long-time-scale Negative Electricity Prices in Shandong Electricity Spot Market of China During “May Day” Holiday
Modeling of Offshore Wind Power Based on Vine Copula Theory and Electricity Market Operation Analysis

Related Author

GUAN Li
HE Guangyu
XIAO Jucheng
FAN Shuai
SHI Zhihao
YAN Zheng
LI Zuyi
GUAN Li

Related Institution

National Power Dispatching Control Center
College of Electrical Engineering, Zhejiang University
Shanghai Non-carbon Energy Conversion and Utilization Institute
Key Laboratory of Control of Power Transmission and Conversion, Ministry of Education(Shanghai Jiao Tong University)
State Grid Energy Research Institute Co., Ltd.
0