您当前的位置:
首页 >
文章列表页 >
Fast Blocking Control Strategy Against Cascading Failures Considering Tripping Time of Transmission Lines
Application Research | 更新时间:2023-06-19
    • Fast Blocking Control Strategy Against Cascading Failures Considering Tripping Time of Transmission Lines

    • Automation of Electric Power Systems   Vol. 47, Issue 12, Pages: 111-120(2023)
    • DOI:10.7500/AEPS20221130011    

      CLC:
    • Received:30 November 2022,

      Revised:2023-03-15,

      Published Online:25 April 2023,

      Published:25 June 2023

    移动端阅览

  • HUANG Siqi,LI Changcheng,KANG Haipeng.Fast Blocking Control Strategy Against Cascading Failures Considering Tripping Time of Transmission Lines[J].Automation of Electric Power Systems,2023,47(12):111-120. DOI: 10.7500/AEPS20221130011.

  •  
  •  

0

Views

0

下载量

5

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Emergency Control Combined with Adjustment and Tripping Against Cascading Failures Based on Decision Space Pruning Reinforcement Learning
Strategy Formulation Method for Security and Stability Emergency Control of Power Grid Based on Multi-state Quantity Characteristics
Rapid Generation of Transient Stability Emergency Control Strategy Based on Feature Matching
电力系统暂态稳定切机控制策略表的快速整定方法

Related Author

CHEN Ge
ZHANG Junbo
PENG Ying
WANG Mingyang
LYU Yazhou
LI Wei
LIU Fusuo
XUE Feng

Related Institution

School of Electric Power Engineering, South China University of Technology
NARI Group Corporation (State Grid Electric Power Research Institute)
State Grid Electric Power Research Institute
State Key Laboratory of Electrical Insulation and Power Equipment(Xian Jiaotong University), Xian
NARI Group Corporation(State Grid Electric Power Research Institute)
0