您当前的位置:
首页 >
文章列表页 >
Planning of Building Integrated Energy System Considering Group Heat Acclimatization
Basic Research | 更新时间:2025-06-16
    • Planning of Building Integrated Energy System Considering Group Heat Acclimatization

    • Automation of Electric Power Systems   Vol. 47, Issue 9, Pages: 70-78(2023)
    • DOI:10.7500/AEPS20220908001    

      CLC:
    • Received:08 September 2022,

      Revised:2022-12-13,

      Published Online:10 February 2023,

      Published:10 May 2023

    移动端阅览

  • MA Gongjin,LIU Jia,ZENG Pingliang,et al.Planning of Building Integrated Energy System Considering Group Heat Acclimatization[J].Automation of Electric Power Systems,2023,47(9):70-78. DOI: 10.7500/AEPS20220908001.

  •  
  •  

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Regulation Performance-oriented Bi-level Optimal Configuration Strategy of Hybrid Energy Storage for Thermal Power-Energy Storage Frequency Regulation
Distributionally Robust Stochastic Optimization for Power System Load Restoration Considering Time-varying Characteristics of Thermostatically Controlled Loads
Combined Optimal Configuration of μPMU for Three-phase Unbalanced Distribution Network Considering Network Reconstruction

Related Author

YAN Gangui
SHA Qianli
LI Junhui
ZHAN Shuo
LI Yongyue
QIAO Xin
CHEN Changming
XUE Yusheng

Related Institution

Key Laboratory of Modern Power System Simulation and Control & Renewable Energy Technology, Ministry of Education (Northeast Electric Power University)
North China Branch, State Grid Corporation of China
Electric Power Research Institute of State Grid Shandong Electric Power Company
State Grid Electric Power Research Institute (NARI Group Corporation)
College of Electrical Engineering, Zhejiang University
0