您当前的位置:
首页 >
文章列表页 >
Main Schemes and Key Technical Problems for Grid Integration of Offshore Wind Farm
Views | 更新时间:2025-06-16
    • Main Schemes and Key Technical Problems for Grid Integration of Offshore Wind Farm

    • Automation of Electric Power Systems   Vol. 46, Issue 21, Pages: 1-10(2022)
    • DOI:10.7500/AEPS20220603001    

      CLC:
    • Received:03 June 2022,

      Revised:2022-08-22,

      Published Online:14 September 2022,

      Published:10 November 2022

    移动端阅览

  • XU Zheng.Main Schemes and Key Technical Problems for Grid Integration of Offshore Wind Farm[J].Automation of Electric Power Systems,2022,46(21):1-10. DOI: 10.7500/AEPS20220603001.

  •  
  •  

0

Views

0

下载量

43

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Large Disturbance Modeling and Stability Analysis for Grid-forming Wind Turbine Connected to Power Grid Through Diode Rectifier
Variable-voltage Operation Control Method for Wind Power System with Flexible Low-frequency Transmission

Related Author

Zheng XU
LI Rui
TONG Wenhao
ZHU Jiebei
WANG Zhiyuan
YU Lujie
YU Lujie
FU Ziyu

Related Institution

School of Electrical Engineering and Automation, Harbin Institute of Technology
Georgia Tech Shenzhen Institute, Tianjin University
School of Electrical and Information Engineering, Tianjin University
Engineering Research Center of Offshore Wind Technology, Ministry of Education (Shanghai University of Electric Power)
College of Electrical Engineering, Shanghai University of Electric Power
0