您当前的位置:
首页 >
文章列表页 >
Calculation Method for Maximum Time Delay of Substation Communication Network Based on Time-sensitive Networking
Application Research | 更新时间:2025-06-16
    • Calculation Method for Maximum Time Delay of Substation Communication Network Based on Time-sensitive Networking

    • Automation of Electric Power Systems   Vol. 47, Issue 1, Pages: 192-199(2023)
    • DOI:10.7500/AEPS20220509007    

      CLC:
    • Received:09 May 2022,

      Revised:2022-07-23,

      Published Online:04 November 2022,

      Published:10 January 2023

    移动端阅览

  • JIA Huibin,HU Zihan,WU Kun,et al.Calculation Method for Maximum Time Delay of Substation Communication Network Based on Time-sensitive Networking[J].Automation of Electric Power Systems,2023,47(1):192-199. DOI: 10.7500/AEPS20220509007.

  •  
  •  

0

Views

0

下载量

5

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Analysis Method for Difference of Similar SCD Files from the Perspective of Big Data
Reliability Evaluation Method for Smart Substation Based on Cyber-Physical Fusion
Abnormal Traffic Detection Method of Substation Communication Network Based on Time-Frequency Domain Mixed Features

Related Author

Yuangang ZHOU
Xuan LIU
Bo ZHANG
Jinsong LI
Xiaoyang TONG
Wei ZHANG
Wenzhuo LI
Na ZHAO

Related Institution

College of Electrical and Information Engineering, Hunan University
Global Energy Interconnection Research Institute Co., Ltd.
Beijing Key Laboratory of Research and System Evaluation of Power Dispatching Automation Technology (China Electric Power Research Institute)
School of Electrical Engineering, Southwest Jiaotong University
Key Laboratory of Aerospace Information Security and Trusted Computing, Ministry of Education, School of Cyber Science and Engineering, Wuhan University
0