您当前的位置:
首页 >
文章列表页 >
Assessment Method for Multi-time-node Response Potential of Adjustable Resource Cluster Considering Dynamic Process
Special Session on Virtual Power Plant with Enormous Flexible Resources | 更新时间:2025-06-16
    • Assessment Method for Multi-time-node Response Potential of Adjustable Resource Cluster Considering Dynamic Process

    • Automation of Electric Power Systems   Vol. 46, Issue 18, Pages: 55-64(2022)
    • DOI:10.7500/AEPS20220501001    

      CLC:
    • Received:01 May 2022,

      Revised:2022-07-02,

      Published Online:25 August 2022,

      Published:25 September 2022

    移动端阅览

  • KONG Xiangyu,LIU Chao,CHEN Songsong,et al.Assessment Method for Multi-time-node Response Potential of Adjustable Resource Cluster Considering Dynamic Process[J].Automation of Electric Power Systems,2022,46(18):55-64. DOI: 10.7500/AEPS20220501001.

  •  
  •  

0

Views

0

下载量

10

CSCD

Alert me when the article has been cited
提交
Tools
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Time-series-Probabilistic Power and Energy Balancing Theory Based on Feasible Region Model of Adjustable Resources
Assessment of Customer Demand Response Potential Based on Load Directrix
Regulation Potential Evaluation and Control Strategy of Air Conditioning Load Considering Multiple Rotation Regulation

Related Author

Qixin CHEN
LI Haibo
QIAO Ying
LU Zongxiang
LIN Yisha
QIAO Ying
LU Zongxiang
LIN Yisha

Related Institution

State Key Laboratory of Power System and Generation Equipment (Tsinghua University)
Tsinghua Sichuan Energy Internet Research Institute
Department of Electrical Engineering, Tsinghua University
State Grid Quanzhou Power Supply Company
Marketing Service Center of State Grid Jiangsu Electric Power Co., Ltd.
0