您当前的位置:
首页 >
文章列表页 >
Optimization of Post-typhoon Rush Repair Strategy for Distribution Network Considering Information Integration of Traffic Network and Distribution Network
Basic Research | 更新时间:2025-06-16
    • Optimization of Post-typhoon Rush Repair Strategy for Distribution Network Considering Information Integration of Traffic Network and Distribution Network

    • Automation of Electric Power Systems   Vol. 46, Issue 4, Pages: 15-24(2022)
    • DOI:10.7500/AEPS20210726005    

      CLC:
    • Received:26 July 2021,

      Revised:2021-08-14,

      Published Online:26 October 2021,

      Published:25 February 2022

    移动端阅览

  • YU Chen,LI Shangxuan,XIE Yunyun,et al.Optimization of Post-typhoon Rush Repair Strategy for Distribution Network Considering Information Integration of Traffic Network and Distribution Network[J].Automation of Electric Power Systems,2022,46(4):15-24. DOI: 10.7500/AEPS20210726005.

  •  
  •  

0

Views

0

下载量

22

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Robust Planning Based Method for Integrated Energy Microgrid Island Partition
网架重构过程中线路潮流越限消除的网络调整策略

Related Author

Kang CHANG
Shaofeng LIU
Shangxuan LI
Chen YU
Jinming YAO
Tianxiang MA
Hui ZHANG
Yan XU

Related Institution

NARI Group Corporation (State Grid Electric Power Research Institute)
Tongxiang Power Supply Company of State Grid Zhejiang Electric Power Co., Ltd., Tongxiang
State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources (North China Electric Power University)
State Grid Hebei Electric Power Research Institute
School of Automation, Guangdong University of Technology
0