您当前的位置:
首页 >
文章列表页 >
Optimal Operation of Virtual Power Plant Considering Environmental Externality and Output Uncertainty of Wind and Photovoltaic Power
Basic Research | 更新时间:2025-06-16
    • Optimal Operation of Virtual Power Plant Considering Environmental Externality and Output Uncertainty of Wind and Photovoltaic Power

    • Automation of Electric Power Systems   Vol. 46, Issue 8, Pages: 50-59(2022)
    • DOI:10.7500/AEPS20210623005    

      CLC:
    • Received:23 June 2021,

      Revised:2021-10-14,

      Published Online:16 December 2021,

      Published:25 April 2022

    移动端阅览

  • SUN Jingqi,WANG Yuan,GUO Xiaohui,et al.Optimal Operation of Virtual Power Plant Considering Environmental Externality and Output Uncertainty of Wind and Photovoltaic Power[J].Automation of Electric Power Systems,2022,46(8):50-59. DOI: 10.7500/AEPS20210623005.

  •  
  •  

0

Views

0

下载量

34

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Two-stage Distributionally Robust Optimization Operation Strategy of Virtual Power Plants Considering Flexible Ramping Products
考虑不确定性因素的虚拟电厂竞标模型

Related Author

YU Hongfei
WANG Yunchu
LYU Ruiyang
JIN Luosong
LIN Zhenzhi
YANG Li
YU Shuang
YIN Boyi

Related Institution

College of Electrical Engineering, Zhejiang University
Zhejiang Power Exchange Center Co., Ltd.
Research Center for Renewable Energy Generation Engineering of Ministry of Education, Hohai University
School of Mechanical Engineering and Automation, Harbin Institute of Technology
School of Electrical and Power Engineering, Hohai University
0