您当前的位置:
首页 >
文章列表页 >
Multi-objective Mixed-integer Linear Programming Model for Short-term Coordination of Power Plants and Power Grid in Cascaded Hydropower Station Under Complex Constraints
Application Research | 更新时间:2025-06-16
    • Multi-objective Mixed-integer Linear Programming Model for Short-term Coordination of Power Plants and Power Grid in Cascaded Hydropower Station Under Complex Constraints

    • Automation of Electric Power Systems   Vol. 45, Issue 21, Pages: 197-205(2021)
    • DOI:10.7500/AEPS20200925016    

      CLC:
    • Received:25 September 2020,

      Revised:2021-05-24,

      Published Online:11 August 2021,

      Published:10 November 2021

    移动端阅览

  • ZHANG Zheng,WU Xinyu,CHENG Chuntian,et al.Multi-objective Mixed-integer Linear Programming Model for Short-term Coordination of Power Plants and Power Grid in Cascaded Hydropower Station Under Complex Constraints[J].Automation of Electric Power Systems,2021,45(21):197-205. DOI: 10.7500/AEPS20200925016.

  •  
  •  

0

Views

0

下载量

6

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Electricity Market Clearing Mechanism Considering Guaranteed Accommodation of Renewable Energy
多区域并行协同的多目标分布式帕累托最优潮流算法

Related Author

Xue LIU
Qixin CHEN
Qingbiao LIN
Hongye GUO
Xichen FANG
XU Fan
LYU Kai
ZHENG Baomin

Related Institution

Department of Electrical Engineering, Tsinghua University
Power Dispatching and Control Center of China Southern Power Grid
State Key Laboratory of Power System and Generation Equipment, Tsinghua University
NARI Group Corporation(State Grid Electric Power Research Institute)
School of Electrical Engineering and Automation, Hefei University of Technology
0