您当前的位置:
首页 >
文章列表页 >
Optimization Method of Resource Combination for Virtual Power Plant Based on Modern Portfolio Theory
Basic Research | 更新时间:2025-06-16
    • Optimization Method of Resource Combination for Virtual Power Plant Based on Modern Portfolio Theory

    • Automation of Electric Power Systems   Vol. 46, Issue 1, Pages: 146-154(2022)
    • DOI:10.7500/AEPS20200828001    

      CLC:
    • Received:28 August 2020,

      Revised:2021-03-12,

      Published Online:13 May 2021,

      Published:10 January 2022

    移动端阅览

  • YUN Qiuchen,TIAN Liting,QI Ning,et al.Optimization Method of Resource Combination for Virtual Power Plant Based on Modern Portfolio Theory[J].Automation of Electric Power Systems,2022,46(1):146-154. DOI: 10.7500/AEPS20200828001.

  •  
  •  

0

Views

0

下载量

10

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Transmission Congestion Management Based on Transmission and Distribution Coordination in Spot Power Market
Current Status and Architecture Design of Standardization for Virtual Power Plants

Related Author

Jinquan ZHAO
Ting YANG
Jianguo YAO
Shengchun YANG
Gang CHEN
Chunlei XU
KONG Xiangyu
ZHANG Peirong

Related Institution

College of Energy and Electrical Engineering, Hohai University
China Electric Power Research Institute
State Grid Jiangsu Electric Power Company Limited
National Key Laboratory of Intelligent Power Distribution Equipment and Systems (Tianjin University)
Training Centre of State Grid Tianjin Electric Power Company
0