您当前的位置:
首页 >
文章列表页 >
Inter-basin Scheduling Method of Cascaded Hydropower Plants Considering Multi-grid Peak Shaving and Hydropower Accommodation
Application Research | 更新时间:2025-06-16
    • Inter-basin Scheduling Method of Cascaded Hydropower Plants Considering Multi-grid Peak Shaving and Hydropower Accommodation

    • Automation of Electric Power Systems   Vol. 45, Issue 14, Pages: 114-122(2021)
    • DOI:10.7500/AEPS20200729002    

      CLC:
    • Received:29 July 2020,

      Revised:2021-01-28,

      Published Online:23 April 2021,

      Published:25 July 2021

    移动端阅览

  • ZHONG Ruhong,CHENG Chuntian,LIAO Shengli,et al.Inter-basin Scheduling Method of Cascaded Hydropower Plants Considering Multi-grid Peak Shaving and Hydropower Accommodation[J].Automation of Electric Power Systems,2021,45(14):114-122. DOI: 10.7500/AEPS20200729002.

  •  
  •  

0

Views

0

下载量

12

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Precise Peak-shaving Strategy at Demand Side Considering Response Reliability and Economy
Frequency Transient Model and Analytical Analysis of Interconnected System Considering Heat Storage of Thermal Power Boiler
Online Evaluation Method for Transient Active Power Support Capability of Wind Farm Considering Wind Speed Uncertainty

Related Author

MA Peng
QI Jun
XIONG Yi
HU Kaijun
HAN Yongming
ZHAO Xuan
SHEN Jiakai
MA Shiying

Related Institution

School of Electrical and Electronic Engineering, Huazhong University of Science and Technology
Alxa Power Supply Company of Inner Mongolia Electric Power (Group) Co., Ltd.
China Electric Power Research Institute
Electric Power Research Institute of State Grid Jibei Electric Power Co., Ltd.
National Power Dispatching and Control Center, State Grid Corporation of China
0