您当前的位置:
首页 >
文章列表页 >
Integrated Power Generation Plan Optimization Considering Automatic Matching of Conditional Transmission Section Limits
Application Research | 更新时间:2025-06-16
    • Integrated Power Generation Plan Optimization Considering Automatic Matching of Conditional Transmission Section Limits

    • Automation of Electric Power Systems   Vol. 44, Issue 20, Pages: 79-85(2020)
    • DOI:10.7500/AEPS20200421002    

      CLC:
    • Received:21 April 2020,

      Revised:2020-06-08,

      Published Online:24 August 2020,

      Published:25 October 2020

    移动端阅览

  • DING Qia,YANG Junfeng,WANG Gang,et al.Integrated Power Generation Plan Optimization Considering Automatic Matching of Conditional Transmission Section Limits[J].Automation of Electric Power Systems,2020,44(20):79-85. DOI: 10.7500/AEPS20200421002.

  •  
  •  

0

Views

0

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Day-ahead Generation Schedule Solving Considering Identification of Security Constraint Coupling
Price Quota Curve Based Optimization of Bidding Strategy for Electricity Retailers
Analysis and Enlightenment of Pumped Storage Dispatch Modes Under American Electricity Market
矩阵算法和优化算法相结合的配电网故障定位
含多端柔性直流电网的调度计划优化建模

Related Author

LAI Xiaowen
LI Peng
WANG Ziqiang
ZHANG Qiang
SUN Yujun
YUAN Quan
Rongzhang CAO
Dehao WANG

Related Institution

Beijing Tsintergy Technology Co., Ltd.
Power Dispatch and Control Center of China Southern Power Grid
State Key Laboratory of Smart Gird Protection and Control
Key Laboratory of Measurement and Control of Complex Systems of Engineering, Ministry of Education (Southeast University)
School of Electric Power, South China University of Technology
0