LI Ji,ZHANG Huiyuan,CHENG Jiehui,et al.Coordinated and Optimal Scheduling of Inter-regional Interconnection System Based on Source and Load Status[J].Automation of Electric Power Systems,2020,44(17):26-33.
LI Ji,ZHANG Huiyuan,CHENG Jiehui,et al.Coordinated and Optimal Scheduling of Inter-regional Interconnection System Based on Source and Load Status[J].Automation of Electric Power Systems,2020,44(17):26-33. DOI: 10.7500/AEPS20200319002.
Coordinated and Optimal Scheduling of Inter-regional Interconnection System Based on Source and Load Status
With the continuing improvement of inter-regional interconnection structure and large-scale distributed generators connecting to power grid
the coordinated and optimal scheduling of inter-regional interconnection system based on source and load status is studied in order to fully utilize the complementary benefits of the existing scheduling resources. Firstly
taking the total operation cost and network loss of power grid at the sending-end and receiving-end as the objective functions
the charging and discharging states of energy storage device at the sending-end and the inter-regional power flow state are judged according to the source and load status at the sending-end and receiving-end. Secondly
considering the operation constraints of the actual system
the improved multi-objective search algorithm based on particle swarm optimization algorithm is used to optimize the charging and discharging powers of energy storage at the sending-end
the inter-regional interconnection plan and the output of the peak-shaving thermal power units at the receiving-end. Finally
the actual power grid in Xinjiang of China is used as an example for simulation calculations. The simulation results show that the proposed inter-regional optimal scheduling strategy can significantly improve the operation efficiency of the sending-end and receiving-end power grids
and give full play to the collaboration of interconnected regions.
MOU Pengtao , ZHAO Dongmei , WANG Jiacheng . Influence mechanism analysis of large-scale wind power integration on power system angle stability [J]. Proceedings of the CSEE , 2017 , 37 ( 5 ): 1324 - 1332 .
LIU Zhenya , ZHANG Qiping , DONG Cun , et al . Efficient and security transmission of wind, photovoltaic and thermal power of large-scale energy resource bases through UHVDC projects [J]. Proceedings of the CSEE , 2014 , 34 ( 16 ): 2513 - 2522 .
YI Bowen , XU Jinhua , YING Fan . Inter-regional power grid planning up to 2030 in China considering renewable energy development and regional pollutant control: a multi-region bottom-up optimization model [J]. Applied Energy , 2016 , 184 : 641 - 658 .
ZHU Lingzhi , CHEN Ning , HAN Hualing . Key problems and solutions of wind power accommodation [J]. Automation of Electric Power Systems , 2011 , 35 ( 22 ): 29 - 34 .
YING Li , LUKSZO Z , WEIJNEN M . The impact of inter-regional transmission grid expansion on China’s power sector decarbonization [J]. Applied Energy , 2016 , 183 : 853 - 873 .
BAO Yuqing , YANG Li , WANG Bei , et al . Day-ahead scheduling considering demand response as a frequency control resource [J]. Energies , 2017 , 82 : 16p .
ZHONG Haiwang , XIA Qing , DING Maosheng , et al . A new mode of HVDC tie-line operation optimization for maximizing renewable energy accommodation [J]. Automation of Electric Power Systems , 2015 , 39 ( 3 ): 36 - 42 .
WANG Bin , XIA Ye , XIA Qing , et al . Model and methods of generation and transmission scheduling of inter-regional power grid via HVDC tie-line [J]. Automation of Electric Power Systems , 2016 , 40 ( 3 ): 8 - 13 .
SHANG Jincheng . Mechanism and risk control strategies for trans-regional and trans-provincial power exchange [J]. Automation of Electric Power Systems , 2010 , 34 ( 19 ): 53 - 58 .
ZENG Fangdi , LI Gengfeng , BIE Zhaohong , et al . Decentralized dispatch method for multi-area interconnected power systems considering cross-area tie-line transaction strategy [J]. Automation of Electric Power Systems , 2018 , 42 ( 16 ): 32 - 40 .
AHMADI-KHATIR A , CONEJO A J , CHERKAOUI R . Multi-area energy and reserve dispatch under wind uncertainty and equipment failures [J]. IEEE Transactions on Power Systems , 2013 , 28 ( 4 ): 4373 - 4383 .
AHMADI-KHATIR A , CONEJO A J , CHERKAOUI R . Multi-area unit scheduling and reserve allocation under wind power uncertainty [J]. IEEE Transactions on Power Systems , 2014 , 29 ( 4 ): 1701 - 1710 .
HAN Hongwei , TU Mengfu , ZHANG Huiling , et al . Day-ahead generation scheduling method considering adjustable HVDC plan and its analysis [J]. Automation of Electric Power Systems , 2015 , 39 ( 16 ): 138 - 143 .
TIAN Xin , SUN Yanlong , NIU Xinsheng , et al . Power transmission mode to promote low-carbon development of load center [J]. Power System Technology , 2015 , 39 ( 3 ): 663 - 668 .
XU Dan , GE Rui , CAI Zhi , et al . Optimization and adjustment method for intraday generation scheduling of regional power grid considering large-scale power loss [J]. Automation of Electric Power Systems , 2017 , 41 ( 7 ): 68 - 73 .
REN Jianwen , XU Yingqiang , YI Chen . Cross-regional wind power consumption model considering power adjustment of DC tie-line [J]. Electric Power Construction , 2017 , 38 ( 11 ): 129 - 135 .
ZHOU Xia , CUI Xiaodan , LI Wei , et al . Risk quantitative assessment of emergency control measures to improve power grid transmission capacity [J]. Automation of Electric Power Systems , 2014 , 38 ( 10 ): 30 - 35 .
LYU Kai , TANG Hao , WANG Ke , et al . Coordinated dispatching of source-grid-load for inter-regional power grid considering uncertainties of both source and load sides [J]. Automation of Electric Power Systems , 2019 , 43 ( 22 ): 38 - 45 .
XIE Hua , TENG Xiaofei , ZHANG Yanjie , et al . Analysis of economic influence factors in wind-photovoltaic-storage microgrid [J]. Automation of Electric Power Systems , 2019 , 43 ( 6 ): 70 - 76 .
XU Dan , WANG Bin , ZHANG Jiali , et al . Integrated transmission scheduling model for wind-photovoltaic-thermal power by ultra-high voltage direct current system [J]. Automation of Electric Power Systems , 2016 , 40 ( 6 ): 25 - 29 .
STREIFFERT D . Multiarea economic-dispatch with tie line constraints [J]. IEEE Transactions on Power Systems , 1995 , 10 ( 4 ): 1946 - 1951 .
LI Junhui , ZHANG Jiahui , MU Gang , et al . Hierarchical optimal scheduling of deep peak regulation for energy storage assisted thermal power units [J]. Power System Technology , 2019 , 43 ( 11 ): 3961 - 3970 .