您当前的位置:
首页 >
文章列表页 >
Construction Method of Economic Operation Region in Automatic Cruise for Bulk Power Grid Dispatching
Basic Research | 更新时间:2025-06-16
    • Construction Method of Economic Operation Region in Automatic Cruise for Bulk Power Grid Dispatching

    • Automation of Electric Power Systems   Vol. 44, Issue 12, Pages: 64-73(2020)
    • DOI:10.7500/AEPS20191018003    

      CLC:
    • Received:18 October 2019,

      Revised:2019-12-12,

      Published Online:20 March 2020,

      Published:25 June 2020

    移动端阅览

  • ZHANG Yikang,ZHAO Jinquan,LIU Ziwen,et al.Construction Method of Economic Operation Region in Automatic Cruise for Bulk Power Grid Dispatching[J].Automation of Electric Power Systems,2020,44(12):64-73. DOI: 10.7500/AEPS20191018003.

  •  
  •  

0

Views

0

下载量

3

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Knowledge Evolution Technology Based on Hybrid-augmented Intelligence for Improving Practicability of Artificial Intelligence in Power Grid Dispatch
促进跨区新能源消纳的直流联络线功率优化模型及分析
直流跨区互联电网发输电计划模型与方法
地区电网智能调度辅助决策系统

Related Author

YU Tao
YANG Shengchun
PAN Zhenning
LI Yaping
ZHANG Xiaoshun
YAO Jianguo
ZHAO Jinquan
XU Fan

Related Institution

China Electric Power Research Institute
School of Electric Power Engineering, South China University of Technology
Foshan Graduate School of Innovation, Northeastern University
NARI Group Corporation(State Grid Electric Power Research Institute)
State Key Laboratory of Control and Simulation of Power System and Generation Equipments, Tsinghua University
0