您当前的位置:
首页 >
文章列表页 >
Two-step Planning of Grid-Resource-Storage Based on Cluster Partition
Basic Research | 更新时间:2025-06-16
    • Two-step Planning of Grid-Resource-Storage Based on Cluster Partition

    • Automation of Electric Power Systems   Vol. 44, Issue 2, Pages: 94-103(2020)
    • DOI:10.7500/AEPS20190618006    

      CLC:
    • Received:18 June 2019,

      Revised:2019-07-30,

      Published Online:07 November 2019,

      Published:25 January 2020

    移动端阅览

  • HU Di,DING Ming,BI Rui,et al.Two-step Planning of Grid-Resource-Storage Based on Cluster Partition[J].Automation of Electric Power Systems,2020,44(02):94-103. DOI: 10.7500/AEPS20190618006.

  •  
  •  

0

Views

0

下载量

11

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Reliability Assessment of DC Distribution System with Truncation-coefficient-based State Merging
Planning of Electric Vehicle Charging-Swapping-Storage Integrated Station in AC/DC Distribution Network
Reliability Assessment of Active Distribution Network Considering Cyber Failure in Uncertain Environment

Related Author

WANG Lei
HAN Xiaoqing
LIANG Dingkang
GAO Qingxu
Yu MA
Menglong ZENG
Gang WEI
Lan ZHU

Related Institution

College of Electrical and Power Engineering, Taiyuan University of Technology
School of Electric Power, South China University of Technology
College of Electrical Engineering, Shanghai University of Electric Power
East China Electric Power Design Institute Co., Ltd.
Huzhou Electric Power Design Institute Co., Ltd.
0