110 kV Artificial Short-circuit Test and Result Analysis of Wind Power Base in Xinjiang Power Grid of China
Engineering Application | 更新时间:2020-07-14
    • 110 kV Artificial Short-circuit Test and Result Analysis of Wind Power Base in Xinjiang Power Grid of China

    • Automation of Electric Power Systems   Vol. 44, Issue 1, Pages: 226-231(2020)
    • DOI:10.7500/AEPS20190617007    

      CLC:
    • Received:17 June 2019,

      Revised:2019-08-11,

      Published Online:11 November 2019,

      Published:10 January 2020

    移动端阅览

  • PENG Yinzhang,WANG Haiyun,WANG Weiqing,et al.110 kV Artificial Short-circuit Test and Result Analysis of Wind Power Base in Xinjiang Power Grid of China[J].Automation of Electric Power Systems,2020,44(01):226-231. DOI: 10.7500/AEPS20190617007.

  •  
  •  

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Adaptability Analysis of Power Directional Elements in Electrochemical Energy Storage Power Stations Connected to Distribution Networks
计及送端风电调频能力的交直流混合电网频率紧急控制策略
Transient Control Method for Grid-forming Direct-drive Wind Turbine Unit Based on DC Voltage Synchronization
Distributed Algorithm for Robust Economic Dispatch of Integrated Transmission and Distribution System Considering Wind Power Uncertainty
Collaborative Robust Planning of Electric and Thermal Flexibility Resources Considering Reserve Optimization

Related Author

LI Chao
LI Borui
LI Bin
LI Xindong
WU Tonghua
LIU Yishi
CHI Yongning
LIU Chao

Related Institution

State Key Laboratory of Smart Grid Protection and Control
School of Electrical and Information Engineering, Tianjin University
National Industry-Education Platform of Energy Storage
State Grid Electric Power Research Institute (NARI Group Corporation)
0