您当前的位置:
首页 >
文章列表页 >
Short-term Generation Optimization Dispatch of Cascade Hydropower Station Reservoirs Considering Time-lag of Water Flow
Basic Research | 更新时间:2020-07-14
    • Short-term Generation Optimization Dispatch of Cascade Hydropower Station Reservoirs Considering Time-lag of Water Flow

    • Automation of Electric Power Systems   Issue 6, Pages: 45-51(2020)
    • DOI:10.7500/AEPS20190411007    

      CLC:
    • Received:11 April 2019,

      Revised:2019-09-06,

      Published Online:30 October 2019,

      Published:25 March 2020

    移动端阅览

  • ZHANG Yanke,LIU Yuan,JI Changming,et al.Short-term Generation Optimization Dispatch of Cascade Hydropower Station Reservoirs Considering Time-lag of Water Flow[J].Automation of Electric Power Systems,2020,44(06):45-51. DOI: 10.7500/AEPS20190411007.

  •  
  •  

0

Views

1

下载量

6

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Optimal Dispatching Strategy of Small Hydropower Enriched Virtual Power Plant Considering Temporal-Spatial Coupling

Related Author

Yuge CHEN
Changming CHEN
Si ZHANG
Li YANG
Huifang WANG
Zhenzhi LIN

Related Institution

Polytechnic Institute, Zhejiang University
College of Electrical Engineering, Zhejiang University
State Grid Zhejiang Electric Power Co., Ltd.
0