浏览全部资源
扫码关注微信
1. 江苏方天电力技术有限公司,江苏省 南京市 211102
2. 昆明理工大学电力工程学院,云南省 昆明市 650500
3. 江苏国信溧阳抽水蓄能发电有限公司,江苏省 常州市 213334
Received:23 January 2019,
Revised:2019-09-18,
Published Online:18 December 2019,
Published:25 March 2020
移动端阅览
单华,王骞,袁超等.基于Stackelberg博弈模型的抽水蓄能电站调相补偿机制[J].电力系统自动化,2020,44(03):139-146.
SHAN Hua,WANG Qian,YUAN Chao,et al.Phase Modulation Compensation Mechanism of Pumped-storage Power Station Based on Stackelberg Game Model[J].Automation of Electric Power Systems,2020,44(03):139-146.
单华,王骞,袁超等.基于Stackelberg博弈模型的抽水蓄能电站调相补偿机制[J].电力系统自动化,2020,44(03):139-146. DOI: 10.7500/AEPS20190123009.
SHAN Hua,WANG Qian,YUAN Chao,et al.Phase Modulation Compensation Mechanism of Pumped-storage Power Station Based on Stackelberg Game Model[J].Automation of Electric Power Systems,2020,44(03):139-146. DOI: 10.7500/AEPS20190123009.
抽水蓄能电站具有调相辅助服务功能,为电网稳定运行提供可靠支撑。首先,针对电力市场环境下未对抽水蓄能电站的调相服务进行补偿分析的现状,为客观衡量抽水蓄能电站调相服务质量及均衡电网企业与抽水蓄能电站的收益,文中设计了无功的“两部制”电价的调相服务补偿机制。其次,基于Stackelberg博弈理论构建了抽水蓄能电站调相补偿模型,并证明了Nash均衡解的存在性和唯一性。最后,以江苏溧阳抽水蓄能电站为例进行仿真分析,得到了均衡解下的博弈双方收益。算例表明电网企业的无功补偿费用与调相服务的类型有关,通过无功电价的制定,可提高抽水蓄能电站与电网企业双方的收益,激励抽水蓄能电站提供调相服务,并对无功出价和调相补偿提出了建议。
Pumped-storage power station has the auxiliary service function of phase modulation
which provides reliable supporting for stable operation of power grid. Firstly
in view of the current situation that no compensation analysis is made for phase modulation service of pumped-storage power station in electricity market environment
this paper designs a compensation mechanism for the phase modulation service with “two-part system” price of reactive power in order to objectively measure the quality of the phase modulation service of pumped-storage power station and balance the benefits between power grid enterprise and pumped-storage power station. Secondly
based on Stackelberg game theory
a compensation model of pumped-storage power station is constructed and the existence and uniqueness of Nash equilibrium solution are proved. Finally
simulation analysis of Liyang pumped-storage power station in Jiangsu Province of China is carried out to obtain the benefits of both sides of the game with the equilibrium solution. The example shows that the reactive power compensation cost of power grid enterprise is related to the type of phase modulation service. Through the draft of reactive power price
the benefits of both pumped-storage power station and power grid enterprise can be increased
and the pumped-storage power station can be encouraged to provide the phase modulation service. Also
suggestions on reactive power bidding and compensation mechanism of the phase modulation are given.
中共中央国务院 . 关于进一步深化电力体制改革的若干意见 [R/OL].[ 2018-11-15 ]. http://news.ncepu.edu.cn/xxyd/llxx/52826.htm http://news.ncepu.edu.cn/xxyd/llxx/52826.htm .
The State Council of the People’s Republic of China . Some opinions on further deepening the reform of electric power system [R/OL]. [ 2018-11-15 ]. http://news.ncepu.edu.cn/xxyd/llxx/52826.htm http://news.ncepu.edu.cn/xxyd/llxx/52826.htm .
国家发展和改革委员会 . 关于完善抽水蓄能电站价格形成机制有关问题的通知 [R/OL].[ 2018-11-15 ]. http://jgs.ndrc.gov.cn/zcfg/201408/t20140812_622012.html http://jgs.ndrc.gov.cn/zcfg/201408/t20140812_622012.html .
National Development and Reform Commission . Notice on improving price formation mechanism of pumped storage power stations [R/OL]. [ 2018-11-15 ]. http://jgs.ndrc.gov.cn/zcfg/201408/t20140812_622012.html http://jgs.ndrc.gov.cn/zcfg/201408/t20140812_622012.html .
梅坚 , 杨立兵 , 李晓刚 , 等 . 调峰市场效用分析与低谷调峰市场设计 [J]. 电力系统自动化 , 2013 , 37 ( 21 ): 134 - 138 .
MEI Jian , YANG Libing , LI Xiaogang , et al . Utility analysis for peak regulation market and trading market design for peak regulation capacity in valley time [J]. Automation of Electric Power Systems , 2013 , 37 ( 21 ): 134 - 138 .
王恺文 , 朱全胜 , 吕泉 , 等 . 计及非常规调峰的省级电网调峰形势评估 [J]. 电网技术 , 2018 , 42 ( 7 ): 2168 - 2177 .
WANG Kaiwen , ZHU Quansheng , LÜ Quan , et al . Situation evaluation of peak regulation of provincial grid considering unconventional peak regulation [J]. Power System Technology , 2018 , 42 ( 7 ): 2168 - 2177 .
陈达鹏 , 荆朝霞 . 美国调频辅助服务市场的调频补偿机制分析 [J]. 电力系统自动化 , 2017 , 41 ( 18 ): 1 - 9 .
CHEN Dapeng , JING Zhaoxia . Analysis of frequency modulation compensation mechanism in frequency modulation ancillary service market of the United States [J]. Automation of Electric Power Systems , 2017 , 41 ( 18 ): 1 - 9 .
陈中飞 , 荆朝霞 , 陈达鹏 , 等 . 美国调频辅助服务市场的定价机制分析 [J]. 电力系统自动化 , 2018 , 42 ( 12 ): 1 - 10 . DOI: 10.7500/AEPS20170821004 http://dx.doi.org/10.7500/AEPS20170821004 .
CHEN Zhongfei , JING Zhaoxia , CHEN Dapeng , et al . Analysis on pricing mechanism in frequency regulation ancillary service market of United States [J]. Automation of Electric Power Systems , 2018 , 42 ( 12 ): 1 - 10 . DOI: 10.7500/AEPS 20170821004 http://dx.doi.org/10.7500/AEPS 20170821004 .
王娟娟 , 吕泉 , 李卫东 , 等 . 电力市场环境下需求侧AGC成本的分摊策略 [J]. 电力自动化设备 , 2012 , 32 ( 6 ): 31 - 35 .
WANG Juanjuan , LÜ Quan , LI Weidong , et al . Allocation of customer-side AGC cost in electricity market environment [J]. Electric Power Automation Equipment , 2012 , 32 ( 6 ): 31 - 35 .
吴锴 . 风电接入后电网调频服务与补偿分摊研究 [D]. 天津 : 天津大学 , 2014 .
WU Xie . Research on the service of the interconnection of wind power grid frequency modulation and compensation payment [D]. Tianjin : Tianjin University , 2014 .
胡军峰 . 风电接入引致电网辅助服务成本分摊机制及模型研究 [D]. 北京 : 华北电力大学 , 2014 .
HU Junfeng . The model of cost allocation mechanism of ancillary services for wind integration [D]. Beijing : North China Electric Power University , 2014 .
耿妍 . 计及多元需求响应资源参与的备用市场研究 [D]. 北京 : 华北电力大学 , 2016 .
GENG Yan . Research on reserve market considering multi demand response resources [D]. Beijing : North China Electric Power University , 2016 .
陈达鹏 , 王健 , 荆朝霞 . 灵活运行方式下碳捕集电厂提供备用服务的决策模型 [J]. 电力系统自动化 , 2017 , 41 ( 12 ): 138 - 145 .
CHEN Dapeng , WANG Jian , JING Zhaoxia . Decision model of carbon capture power plant to provide reserve service under flexible operation [J]. Automation of Electric Power Sytems , 2017 , 41 ( 12 ): 138 - 145 .
施泉生 , 李士动 , 张涛 . 考虑碳排放成本的备用市场竞价模型 [J]. 电力系统保护与控制 , 2014 , 42 ( 16 ): 40 - 45 .
SHI Quansheng , LI Shidong , ZHANG Tao . A reserve market bidding model considering carbon emission costs [J]. Power System Protection and Control , 2014 , 42 ( 16 ): 40 - 45 .
周攀 , 邓拓夫 , 秦俊 . 抽水蓄能机组调相压水系统设计与控制策略 [J]. 水电能源科学 , 2017 , 35 ( 9 ): 147 - 149 .
ZHOU Pan , DENG Tuofu , QIN Jun . Design and control strategy for condenser dewatering system of pumped-storage power station [J]. Water Resources and Power , 2017 , 35 ( 9 ): 147 - 149 .
高苏杰 , 娄素华 . 抽水蓄能电站综合效益评估综述 [J]. 水电自动化与大坝监测 , 2008 ( 1 ): 11 - 15 .
GAO Sujie , LOU Suhua . Review on the evaluation of static and dynamic benefits of pumped storage power plants [J]. Hydropower Automation and Dam Monitoring , 2008 ( 1 ): 11 - 15 .
张青艳 , 陈宁 , 张健 . 抽水蓄能电站备用效益研究综述 [J]. 水力发电 , 2007 , 33 ( 9 ): 47 - 50 .
ZHANG Qingyan , CHEN Ning , ZHANG Jian . The review on the dynamic reserve benefit of pumped-storage power station [J]. Water Power , 2007 , 33 ( 9 ): 47 - 50 .
何永秀 , 关雷 , 蔡琪 , 等 . 抽水蓄能电站在电网中的保安功能与效益分析 [J]. 电网技术 , 2004 , 28 ( 20 ): 54 - 57 .
HE Yongxiu , GUAN Lei , CAI Qi , et al . Analysis of securing function and economic benefit of pumped storage station in power grid [J]. Power System Technology , 2004 , 28 ( 20 ): 54 - 57 .
徐得潜 . 抽水蓄能电站电价制定方法与经济运行方式研究 [D]. 合肥 : 合肥工业大学 , 2015 .
XU Deqian . Electricity tariff formulation and economic operation mode of pumped-storage power station [D]. Hefei : Hefei University of Technology , 2015 .
李培栋 , 孙薇 , 孟亚敏 . 电力市场环境下抽水蓄能电站的联合租赁经营模式 [J]. 华东电力 , 2005 , 33 ( 2 ): 32 - 34 .
LI Peidong , SUN Wei , MENG Yamin . United lease operation mode of pumped-storage power station in power market environment [J]. East China Electric Power , 2005 , 33 ( 2 ): 32 - 34 .
吴跨宇 , 卢岑岑 , 袁亚洲 . 抽蓄机组调相运行对宾金直流无功电压支撑的仿真研究 [J]. 中国电力 , 2018 , 51 ( 3 ): 54 - 61 .
WU Kuayu , LU Cencen , YUAN Yazhou . Simulation analysis of voltage support to Binjin HVDC provided by pumped storage unit’s synchronous condenser operation [J]. Electric Power , 2018 , 51 ( 3 ): 54 - 61 .
YU M M , HONG S H . A real-time demand-response algorithm for smart grids: a Stackelberg game approach [J]. IEEE Transactions on Smart Grid , 2015 : 7 ( 2 ): 879 - 888 .
RICH P . Rethinking common belief, revision, and backward induction [J]. Mathematical Social Sciences , 2015 , 75 : 102 - 114 .
黄伟 , 李玟萱 , 车文学 . 基于Stackelberg模型的主动配电网动态电价需求响应设计 [J]. 电力系统自动化 , 2017 , 41 ( 14 ): 70 - 77 .
HUANG Wei , LI Minxuan , CHE Wenxue . Stackelberg model based dynamic pricing demand response design for active distribution network [J]. Automation of Electric Power Systems , 2017 , 41 ( 14 ): 70 - 77 .
EL RAHI G , ETESAMI S R , SAAD W , et al . Managing price uncertainty in prosumer-centric energy trading: a prospect-theoretic Stackelberg game approach [J]. IEEE Transactions on Smart Grid , 2019 , 10 ( 1 ): 702 - 713 .
DEB K , JAIN H . An evolutionary many-objective optimization algorithm using reference-point-based nondominated sorting approach, part I: solving problems with box constraints [J]. IEEE Transactions on Evolutionary Computation , 2014 , 18 ( 4 ): 577 - 601 .
韩畅 , 林振智 , 杨莉 , 等 . 考虑经济性和网架性能的抗灾型骨干网架多目标规划 [J]. 电力系统自动化 , 2019 , 43 ( 2 ): 34 - 41 . DOI: 10.7500/AEPS20180313002 http://dx.doi.org/10.7500/AEPS20180313002 .
HAN Chang , LIN Zhenzhi , YANG Li , et al . Multi-objective planning for anti-disaster backbone grid considering economics and network frame performance [J]. Automation of Electric Power Systems , 2019 , 43 ( 2 ): 34 - 41 . DOI: 10.7500/AEPS 20180313002 http://dx.doi.org/10.7500/AEPS 20180313002 .
0
Views
0
下载量
3
CSCD
Publicity Resources
Related Articles
Related Author
Related Institution
京公网安备11010802024621