您当前的位置:
首页 >
文章列表页 >
大功率缺失下抽水蓄能机组分阶段有功控制方法与实现
更新时间:2025-08-13
    • 大功率缺失下抽水蓄能机组分阶段有功控制方法与实现

    • Automation of Electric Power Systems   Vol. 43, Issue 3, Pages: 193-199(2019)
    • Published:2019

    移动端阅览

  • TAN Chao. [J]. Automation of electric power systems, 2019, 43(3): 193-199. DOI:

  •  
  •  

0

Views

2266

下载量

3

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Bidding Strategy for Frequency Regulation Capacity of Electrolytic Aluminum Loads Oriented to Frequency Regulation Ancillary Service
Chance-constrained Economic Dispatch Method Considering Fine-grained Response Actions of Automatic Generation Control
Frequency Characteristics and Countermeasures of Receiving-end Power Grid Under Short-term Power Impact

Related Author

LIAO Siyang
SI Tianfang
XU Jian
KE Deping
LI Lingfang
CHEN Yixuan
LEI Xingyu
YANG Linze

Related Institution

Yunnan Grid Research Construction and Planning Center of Yunnan Power Grid Co., Ltd.
School of Electrical Engineering and Automation, Wuhan University
Hubei Engineering and Technology Research Center for AC/DC Intelligent Distribution Network (Wuhan University)
State Key Laboratory of Power Transmission Equipment & System Security and New Technology(Chongqing University)
State Grid Chongqing Electric Power Research Institute
0