With the more access of microturbines or combined heat and power units to distribution network
the coupling relationship and joint optimization among power systems
natural gas systems and heating systems attach more and more attention. Aiming at the day-ahead dispatch problem of integrated electricity-gas-heat system
a day-ahead dispatch model minimizing the economic cost is established. The model including the distribution network
the heat-supplying network and the natural gas network model with the consideration of the dynamic characteristics of natural gas has been established. In addition
considering the opaque characteristics of information
management
and capital between integrated electricity-gas-heat system
a day-ahead dispatch optimization method is proposed based on improved alternative direction multiplier method(ADMM)
i. e. ADMM with Gaussian back substitution algorithm. Finally
the validity of the proposed model and optimization framework is verified by case study.