您当前的位置:
首页 >
文章列表页 >
多运营主体梯级水电站参与的日前市场出清模型
更新时间:2025-08-13
    • 多运营主体梯级水电站参与的日前市场出清模型

    • Automation of Electric Power Systems   Vol. 42, Issue 16, Pages: 104-110(2018)
    • Published:2018

    移动端阅览

  • ZHANG Lizi. [J]. Automation of electric power systems, 2018, 42(16): 104-110. DOI:

  •  
  •  

0

Views

2136

下载量

22

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

多主体梯级水电参与日前市场下游电站自调度投标策略
Day-ahead Market Bidding Model for Cascade Hydropower Stations Considering Price Risk and Contract for Price Difference
Identification Method for Key Operational Risks of Cascade Hydropower Stations for Integration of Basin Hydro-Wind-Solar Power
Analytical Method for Defense Capability of Large-scale Cascade Hydropower Stations Against Extreme Fluctuations of Renewable Energy in Power Grid

Related Author

ZHANG Lizi
Bangcan WANG
Chuntian CHENG
Yapeng LI
Gang LI
Xuguang YU
WANG Mingbo
ZHANG Juntao

Related Institution

School of Electrical and Electronic Engineering, North China Electric Power University
Institute of Hydropower System & Hydroinformatics, Dalian University of Technology
Kunming Power Exchange Center Co., Ltd.
China Yangtze Power Co., Ltd.
Institute of Hydropower and Hydroinformatics, Dalian University of Technology
0