great changes have taken place in the economic structure of China. The prediction based on the historical data of electric power load will cause great error. In order to solve the problem which traditional load forecasting method is not enough for economic and meteorological factors
a forecasting method for medium-term load is proposed. This method can consider the influence of economy
climate and other factors. First
using seasonal decomposition
the monthly electricity consumption of history is decomposed into long-term and cycle component
seasonal component and irregular component
and the relationship between economic factors and long-term trend and cyclic components of electricity consumption is analyzed by cointegration test and Granger causality test in econometrics. The key indexes to influence the prediction of electric quantity is determined. Each component is predicted by support vector machine(SVM)based on electricity
meteorology and economic data
and the monthly total quantity of electricity is predicted. Finally
the effectiveness and feasibility of the method are illustrated by an example.