您当前的位置:
首页 >
文章列表页 >
考虑源荷双侧预测误差的实时发电计划闭环控制模型
更新时间:2025-08-13
    • 考虑源荷双侧预测误差的实时发电计划闭环控制模型

    • Automation of Electric Power Systems   Vol. 42, Issue 6, Pages: 98-105(2018)
    • Published:2018

    移动端阅览

  • YIN Jiafu. [J]. Automation of electric power systems, 2018, 42(6): 98-105. DOI:

  •  
  •  

0

Views

2540

下载量

7

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Multi-state Interval Optimization Strategy for Energy Storage Clusters Considering Frequency Regulation Capability and Economic Benefits
Provincial and Regional Active Power Cooperative Control Technology for Energy Storage on Power Grid Side Based on Wide-area Information Interaction
Identification Method for Automatic Generation Control Oscillation Mode Based on Ambient Measurements
Optimal Control Strategy of Peak and Frequency Regulation for Adjustable Loads Considering Operation Characteristics of Resources
False Data Injection Attack Detection for Automatic Generation Control System Based on Set-membership Filtering

Related Author

DUAN Xiaohan
SUN Dan
ZHAO Chen
NIAN Heng
ZHANG Jiangfeng
GUO Binqi
WANG Tianyu
WU Jiping

Related Institution

College of Electrical Engineering, Zhejiang University
School of Information Engineering, Hangzhou Dianzi University
NARI Group Corporation(State Grid Electric Power Research Institute)
Electric Power Research Institute of State Grid Zhejiang Electric Power Co., Ltd.
Northeast Branch of State Grid Corporation of China
0