您当前的位置:
首页 >
文章列表页 >
考虑失负荷风险的配电网光/储与计划孤岛协同规划
更新时间:2025-08-13
    • 考虑失负荷风险的配电网光/储与计划孤岛协同规划

    • Automation of Electric Power Systems   Vol. 41, Issue 19, Pages: 30-36(2017)
    • Published:2017

    移动端阅览

  • LIU Wenxia. [J]. Automation of electric power systems, 2017, 41(19): 30-36. DOI:

  •  
  •  

0

Views

3046

下载量

6

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Morphological Structure and Development Path of Urban Energy System for Carbon Emission Peak and Carbon Neutrality
Research Progress and Prospects of Transmission Expansion Planning Method for High Proportion of Renewable Energy
Multi-energy Complementary Based Coordinated Optimal Planning of Park Integrated Energy Station-Network

Related Author

SHI Xiaohan
ZHANG Hengxu
ZHANG Jifan
Siyuan SUN
Yun WANG
Zehui YAN
Gengfeng LI
Zhaohong BIE

Related Institution

School of Electrical Engineering, Shandong University
School of Electrical and Engineering, Xi’an Jiaotong University
Key Laboratory of Control of Power Transmission and Conversion, Ministry of Education (Shanghai Jiao Tong University)
State Grid Economic and Technological Research Institute Co., Ltd.
School of Electric Power, South China University of Technology
0